My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9929 EVERGREEN WAY HORIZON BANK 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
9929
>
HORIZON BANK
>
9929 EVERGREEN WAY HORIZON BANK 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2018 3:35:24 PM
Creation date
10/30/2018 3:33:20 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9929
Tenant Name
HORIZON BANK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. An onsite traffic circulation and signage plan shall be provided and approved by <br />the city's traffic division. <br />10. Any existing unused driveways on this projecYs frontages must be removed and <br />replaced with curb, gutter and sidewalk Ner City standards. <br />11. Landscape plantings at the driveway entrance/exits to the public streets shall be of <br />a variety that will not adversely impact vehicle and/or pedestrian sight distance and <br />shall be maintained to preserve required sight distances. <br />12. Lack of comment on the plans submitted with the application does not constitute <br />approval of these plans. <br />13. A fire hydrant is required within 200 driving feet but not closer than 50 feet of every <br />structure. <br />14. City streets and alleys are to be kept clear of dirt and debris at all times during <br />construction. Dust suppression and street cleaning must occur as directed by the <br />Public Works Inspector. <br />15. A one year warranty is required on the public improvement for an amount not less <br />than 10% of the cost of construction and shall run for one year from the date of <br />final approval/issuance of the first Occupancy Permit. <br />16. As-builts of storm sewer, sanitary sewer, and water systems will be required to be <br />submitted per City Design and Construction Standards and Specifications for <br />Development. <br />17. A PerFormance Guarantee is required for street improvements on this projecYs <br />frontage prior to any building permit being issued. <br />18. Any hroken or damaged sidewalk shall be repaired/replaced per the City Public <br />Works Inspector. <br />19. Pedestrian walkways shall be provided from the building to the public sidewalk. <br />20. The construction plans shall be designed from a site survey performed by a <br />licensed State of Washington land surveyor. <br />21. Temporary erosion control measures for construction activity must be operational <br />prior to commencement of any clea�ing or earthwork. <br />22. Detention of stormwater runoff may be required in accordance with City standards. <br />Actual existing conditions may be used to determine pre-development runoff rates. <br />
The URL can be used to link to this page
Your browser does not support the video tag.