My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9929 EVERGREEN WAY HORIZON BANK 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
9929
>
HORIZON BANK
>
9929 EVERGREEN WAY HORIZON BANK 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2018 3:35:24 PM
Creation date
10/30/2018 3:33:20 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9929
Tenant Name
HORIZON BANK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. Fire Alarm Svstem - An approved autcrnatic fire detection system shall be <br />provided as required by City Ordinance No. 1902-92, Chapter 16.76, of the Everett <br />Municipal Code. <br />Plans for such system shall be submitted 4o the Fire Marshal for review and <br />approval prior to installation. Submittal shall include cut sheets of all equipment <br />intended for use. Approp�iate trip tests, witnessed by a Fire Department inspector, <br />shall be perfermed, along with a certificate of c�mpletion, prior to final acceptance <br />of the system. <br />Fire alarm systems shall be installed according to NFPA Standard 72. Installation <br />of fire alarm components, in�luding basic wiring, may not commence before <br />plans are approved by the Fire Department Plan Reviewer. Fire alarm <br />drawings must be professionally rendered, in sufficient detail, and must be <br />internally consistent. Riser diagrams must match installation plans and load <br />calculations. Components must be listed and a�proved for use together. <br />Changes to plans must include new drawings and calculations and must be <br />approved by the Fire Department Plan Reviewer prior to installation. Fire alarm <br />installation is subject to field inspection by a Fire Department Inspector. An <br />approved set of plans and the Building Department electrical permit must be <br />present for any installation in:;pection. <br />Fire alarm systems shall be insi�iled under permit of the City of Everett Building <br />Department. Electrical inspections and approval are required prior to calling for <br />acceptance tests. For permit information call (425) 257-881Q. <br />The absence of working phone lines for the alarm system will be cause for <br />postponing fire department inspection and testing and shall result in denial <br />of occupancy. <br />12. Fire Suppression (Sprinkler) Svstem - An approved automatic suppression system <br />shall be provided as required by City Ordinance No. 1902-92, Chapter 16.76, of <br />the Everett Municipal Code. The system must include a mechanical water <br />gong bell. <br />Plans for any such system shall be submitted to the Building Department for <br />examination and approval. Such plans shall include plans for the underground <br />mains that will supply the sprinkler system. <br />The type of sprinkler to be installed will be determined by the Building Official. It <br />may be an NFPA 13, NFPA 13R, or NFPA 13D system depending upon several <br />factors. Sprinkler installation shall not begin without an approved and <br />stamped set of plans from the Building Department. Tne Fire Department will <br />also review tlie plans and shall field inspect the installation based only on <br />approved plans that must be on site. Changes to plans must be approved by both <br />the Building and Fire Departments. <br />s <br />�y <br />
The URL can be used to link to this page
Your browser does not support the video tag.