My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9929 EVERGREEN WAY HORIZON BANK 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
9929
>
HORIZON BANK
>
9929 EVERGREEN WAY HORIZON BANK 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2018 3:35:24 PM
Creation date
10/30/2018 3:33:20 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9929
Tenant Name
HORIZON BANK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
--- - --- - __ _ <br />_ -----___--.--- <br />, „ <br />COME RAIN, WE SHINE'" ' '1� � <br />' �,;� STORMWATER � ' <br />�� M4NAGEMENIINC.! <br />.I <br />Horizon Bank - Stormwater Treatment System <br />Size and Cost Estimate <br />Everett, Washington <br />In(ormation nrovided: <br />• Total contributinp, area = 1.08 acres <br />• Impervious area = 0.8uCi acres <br />• Presiding agency = Citp oi Gverett. 4Vashinglon <br />Assumotions: <br />• Media = Perlile cartridges <br />• Cartridge (low rate = 15 gallons per minute <br />• Drop requircd from inlet to outlet = 2.3' minimum <br />Size_�nd cost estimates: <br />The StormFilter is a^�xv-based system, and therefore. �s sizecl by calculating the peak ���ater <br />quality flow rate associated with the design storm. The water qualiry flow rate was calculated <br />and provided by+he engineer. <br />The StormFilter for this site was sized based on a treatment flow rate of 0.15 cfs. To <br />accommodate this flow rate. Stormwater Managen;�nt recommends using a 6' x 8' prec�sl <br />SrormFiltcr �.vith 5 cartridges. 1he estimated cost of this system is 516.900. r,omplelu and <br />delivered to thejob site. lhis estimate assumes Iha[ the vault is less than 10 feet d�ep. Tlie <br />(inal system cost will depend on the actual depth n( the unrts and whether extras like doors <br />rather than castings are specdicd. The contrector is responsible for setting lhe StormFilter <br />vault and all extemal plumbing. <br />The precast StormFilter has an internal byp2ss capacity of 1.$ cfs. I( the peak discharge off <br />the site is expected to excead th2? rate, we recommend placing a high-floa, bypass upstream <br />of the StormFilter system. Storm�vater Management could provide our high flow bypass. Ihe <br />SlormGate. �;hir,h provides a combination �veir�oriflc�� ,rontrGl Structure lo li�nit lhC flOw to the <br />StormFiller, for appro.�imatel� hd,000. �Ilie final cust tvoulU depenU en tho aclual depth and <br />size o( lhe unil. <br />5�11 E'�'GR: TE��1 :1,'1'1,�05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.