Laserfiche WebLink
16. Compaction. The permittee shall thoroughly compact solid waste before <br /> succeeding layers are added according to the permit application. <br /> 17.Maintenance of Monitoring Systems. The permittee shall maintain the monitoring <br /> systems for air, ground water, and surface water according to the permit <br /> application. <br /> 18.Require Recycling. The permittee shall provide the opportunity to recycle solid <br /> wastes according to the permit application. <br /> 19.Municipal/Sewage SludgeBiosolids. The permittee shall prohibit disposal of <br /> municipal sewage sludge or biosolids in accordance with the permit application. <br /> Section VII. Ground Water Monitoring Program and Hydrogeologic Report <br /> 1. Groundwater Standard. The permittee shall not allow the facility to exceed the <br /> maximum contaminant levels in groundwater specified in the permit application <br /> at the approved point(s) of compliance. The permittee shall also not cause <br /> exceedances of standards contained in chapter 173-200 WAC (Drinking Water <br /> Regulations). <br /> 2. Hydrogeologic Report. The hydrogeologic report dated November 1994 which <br /> meets the performance standards of WAC 173-351-490 is approved. <br /> 3. Groundwater Monitoring Program. The Groundwater Monitoring Plan submitted <br /> in the permit application, which meets the performance standards of WAC 173- <br /> 351-400 through 490 is approved. <br /> Section VIII. Quality Assurance and Quality Control. The permittee shall perform all <br /> construction activities, including closure cap construction in general conformance <br /> with construction specifications, final design drawings, constructions quality control <br /> plans and construction quality assurance plans approved by the Klickitat County <br /> Health Department prior to construction. Construction quality assurance shall be <br /> performed by an independent third party. <br /> Section IX. Closure and Post-Closure Plans. <br /> 1. The permittee shall perform closure and post-closure according to the permit <br /> application and subject to the submittal and approval by the Klickitat County <br /> Health Department of a post-closure groundwater monitoring plan, within thirty <br /> (30)days of permit issuance. <br /> 2. Final cover design for the landfill shall meet the design standards, as described in <br /> the closure plan. At minimum,the final cover shall meet the requirement of WAC <br /> 173-351. <br /> Section X. Financial Assurance for Closure,Post-Closure and Corrective Action. <br />