Laserfiche WebLink
Part 5 — DESCRIPTION OF INDEPENDENT REMEDIAL ACTIONS AT THE SITE continued <br /> B. Status of Remedial Actions. <br /> What is the current status of remedial actions at the site? Please check all that apply in the table below. <br /> REMEDIAL ACTION PLANNED ONGOING COMPLETED NOT APPLICABLE <br /> INITIAL RESPONSE(UST ONLY) X <br /> INTERIM ACTION X <br /> REMEDIAL INVESTIGATION X <br /> • <br /> FEASIBILITY STUDY X <br /> CLEANUP ACTION X <br /> C. Documentation of Remedial Actions. <br /> Please list in the table below all known remedial action plans or reports produced for the site, including: <br /> • The title of the plan or report, <br /> • The author (e.g. consulting firm) of the plan or report, <br /> • The date the plan or report was produced, <br /> • Whether the plan or report has been submitted to Ecology; Reports listed below are included with <br /> VCP application <br /> • The date the plan or report was submitted to Ecology. <br /> SUBMITTED TO ECOLOGY <br /> TITLE AUTHOR DATE <br /> Y/N? DATE <br /> Ex: John Doe's Site: Remedial Investigation Work Plan Mom's Consulting Firm 02/20/05 NO N/A <br /> 1. Phase I Environmental Site Assessment Whitman Environmental 06/30/98 NO N/A <br /> 2. Phase I Environmental Site Assessment GeoEngineers 10/27/16 NO N/A <br /> 3. Phase II Environmental Site Assessment GeoEngineers 01/03/17 NO N/A <br /> 4. <br /> 5. <br /> 6. <br /> 7. <br /> 8. <br /> 9. <br /> 10. <br /> ECY 020-74(revised May 2013) 16 <br />