Laserfiche WebLink
GE�IERA� �IOTES <br /> r <br /> 1 . THE BOEING EVERETT FIRE INSPECTION DEPARTMENT <br /> (425-342-2266) SHALL BE NOTIFIED 24 HOURS IN <br /> ADVANCE OF ALL VALVE CLOSURES, FLUSHING, AND � <br /> HYDROSTATIC TESTS ON THE FIRE PROTECTION SYSTEM. <br /> . THE MAXIMUM DURATION OF A SYSTEM CLOSURE IS 8 <br /> �`� �- � -- HOURS UNLESS PERMISSION IS GRANTED BY THE FIRE � <br /> � � n � i � � , , `� �� � '� � CHIEF. <br /> � 2. A CONTRACTOR'S MATERIAL ANQ TEST CERTIFICATE WILL <br /> VAN DECK UPRIGHT QUICK RESPONSE BE REQUIRED UPON COMPLETION OF THE TESTING. THE <br /> O CERTIFICATE MUST BE SIGNED OFF BY THE BOEING <br /> SPRINKLER HEAD 155°F EVERETT FIRE INSPECTOR DEPARTMENT PRIOR TO <br /> , RATING (TYP 5) REDUCING TEE <br /> COMMENCING ADDITIONAL WORK ON THE FIRE <br /> REDUCING TEE PROTECTION SYSTEM. <br /> . - - - -- - - - - - - - - - -�- -- - - SV25-21 <br /> � � � � 3 � „ 3. ALL SPRINKLER PIPING 1 �/" AND SMALLER SHALL BE <br /> SEE DETAIL 4 S DN TO TUNNEL <br /> . 1• l. 1-1i2• � ( i-1i2, �2" 1 ' � '� 1 M284 M522 ZONE 6 SPRINKLER � � SCHEDULE 40 ASTM A-53 BLACK STEEL. ALL PIPING <br /> , <br /> iz�-s� iz�-6• iz--6� iz�-6� � 2 SYSTEM 2" AND LARGER SHALL BE ASTM A-53 SCHEDULE 40 <br /> __ __ __ __ _ __ __ _� �_�__ __ _ __ __ _ ( __ __ __ __ __ ! . FOR VERTICAL RISERS AND SCHEDULE 10 FOR . <br /> � I�—j I _ �— 2" MAIN DRAIN � HORIZONTAL MAINS AND CROSS MAINS. <br /> / \ - , _ _ _ _ _ _ _„_ ,_ _ � �_ � = _ _ � � ; , � 4. SPRINKLER SYSTEM PIPE FITTINGS SHALL BE 150 LB. <br /> ;, � , T=r"" �I- 1- -:� � � �- - -- �� „ <br /> / � �—�..�_ __ _�_ _ _ _ � �� _ _ ____ _ � �� �_�_ �I � -T� c � �. �.� THREADED MALLEABLE IRON FOR 1 �/ AND SMALLER, <br /> �� --q-- � --�-- u— �;J-- f- � .� � �. — — - - - — --a-=� __�-----�- � <br /> � <br /> ����� � ' �� � O � I � �--�- -- -- - , � °� `� � j d° ��� � �� ! � � t� �� AND VICTAULIC GROOVED FITTINGS FOR 2�/" AND <br /> � � -------��- �> � ��� � �/ ,� <br /> r --- � �_ � � __ _ F � �___ �� � �,� _I�(� __ LARGER . PIPE FITTINGS FOR 2 MAY BE EITHER 150 <br /> � — — — ---------------------------------- -----�— ----------------J �---- ��— ----------------------- — - — I---------------- ---------- — <br /> - - -- --- - - --„ -----------------------'- ----�----�-------- -_- _----------------------CNIEB)Q[�ECRE�-LYf2�L��-- --- � ---J �-=-r? -� „ LB. THREADED MALLEABLE IRON OR VICTAULIC GROOVED. <br /> ---- ------------ ---------------------- — <br /> � 6 HUB DRAIN (RE�) 8 ROOF RISER <br /> 8" ROOF RISER 2" MAIN DRAIN 2-��2" 1 st FLR HOSE CABINET 2" F DN 4" F U P 8" H U B D R A I N (R E F) � � 8" TOWER RISER 5. C O U P L I N G S F O R G R O O V E D P 1 P E A N D F I T T I N G S S H A L L B E <br /> . 6" HOSE RISER I 1 1/4" INSPECTORS TEST „ � S E E D E T A I L � 1 1/4" I NSP ECTORS T E ST � NO ED LIC STYLE 07 ZERO-FLEX UNLESS OTHERWISE ' <br /> 8" TOOLING RISER �0 3 4 � 1 M284 M522 1 ST FLOOR SPRINKLER al 6. HYDROSTATIC TEST: PRESSURE - 225 PSIG, DURATION � <br /> � F � „ � 4„ - 2 HOURS. . <br /> SYST M <br /> w � SV25-21 2 7. AUTOMATIC SPRINKLER HEADS SHALL BE 165 DEGREE F. <br /> z c� » UPRIGHT SPRINKLER HEAQ " TEMPERATURE RATED. <br /> = 0 6 165°F� RATING (TYP) 1 1/2 HOSE <br /> �, l ! I CONNECTION 8, ALL E Q U I P M E N T SH A L L B E U L L I S T E D A N D F M <br /> APPROVED FOR FIRE SERVICE. INSTALLED PER THE <br /> ��� RUN UNDER SECOND ZONE H - -I � I i SEE DETAIL <br /> ! FLOOR BEAMS 16'-6" AFF SYSTEM � LATEST EDITION OF NFPA 13. <br /> F 2 <br /> ----,---- --------- � <br /> � �-------- -------------— -r r �----�---_---- -_- ---------- ----------- -----------r-----� ------------------- �°`�� - - - - - 1 M284 M522 <br /> . C-�-- �- -� �---- � I i �-------------j I I j-- ---- - -- --- ------------------------ ---� i i i ----------4„ F UP �c� ❑; <br /> � <br /> I � I I I I i I I, . <br /> � � I � � � � � I I � II li I � � I � � � . <br /> I I � I I I I � I i � II II II I � !, I <br /> � � � ' � � ' ► ' � � ' � � � � � � , � � , CONSTRUCTIOf� �IOTES � <br /> I j I I I I � � I I � I I I I � J' � � � � UNDER MEZZANWE �,; i � � <br /> SPRINKLER SYSTEM � � <br /> j j I �________� I I j j I j j � j � j j � 1 . CONTRACTOR SHALL INVESTIGATE AND VERIFY <br /> � <br /> I I �-----------� � I I � I I I I �' I I � , L O C A T I O N S O F S T R U C T U R A L, M E C H A N I C A L, A N D <br /> ? i � I � I I � I I i i ��� i � � I � � � ELECTRICAL ELEMENTS AND OTHER EXISTING <br /> 1 1%4" I N S P E C T O R S T E S T � ! I � I I I ! '�—�� I � � I ; C O N D I T I O N S P R I O R T O B E G I N N I N G T HE W O R K. <br /> ii I I II I � � � � I I � �� ; . <br /> � � I � I I � II II I � � I <br /> I I � I I � I I I I i � I I � j, 2. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS <br /> � f � I 8" TOOLING RiSER � � I i � I I I I � � � I I � i � AND CONTRACT DOCUMENTS SHALL BE CALLED TO � <br /> � � I � I Ij jI �� jI ; Ij o � --'�'I � � ��, <br /> , � � i � � /I,\ I THE ATTENTION OF BRPH. <br /> I � <br /> �`- _i ��� i / <br /> = -- � <br /> --�� \�' �--- --— I n �� �-----� — - — ---1-1--I I — ° _\— - -- --- -- - — /� a �I �- -'- � I ! _ � � �� ��� '. <br /> � _ ^ � �� _ � � � � �-� � � �� ��� 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br /> \ SEE BLDG 40 026 I I I I �; � SAFETY IN THE AREA OF WORK IN ACCORDANCE <br /> � FOR CONTINUATION _ j i i i _ __ __ __ __ __ __ _ �_ 1 1/4 INSPECTORS TEST <br /> „ <br /> - -- -- �- -- -- - -- --- -- <br /> WITH ALL OSHA AND BOEING STANDARDS. <br /> 8" ROOF FIRE RISER FUTURE BUILDING 26 <br /> � 6" HOSE FIRE RISER � NEW VAN DECK EXTENSION FOR POSITION#4 UTILITY <br /> I � � � F,UTURE BUILDING 26 � � BOOM (REF) � <br /> � 8 ROOF FIRE RISER � PROVIDE NEW WET FIR� SPRINKLER INDICATED BY . <br /> O DASHED REGION. <br /> HAZARD: ORDINARY HAZARD (GROUP 2) <br /> - TEMPERATURE RATING: 165°F <br /> - IMPACTED RISER: SV 25-1 <br /> � o1 o3 o5 o7 o9 o11 <br /> 0.9 I I I I I I 11' _ <br /> � � BI�DG 40t24 I I � <br /> � � � � � �� `-' <br /> � - ---� - <br /> �� 1 M260� 1 M261 �1_M262,�M263 �1 M264 '� � K <br /> I� � � � � �) � . <br /> PARTIA� FIRST FLOOR FiRE PROTECTI0 �1 P �A�I '� _ � _ _ � _ � _ � �, � <br /> � I ��- ----}- -}- ---�--- --}---- �- L3 I <br /> \ <br /> SCALE:1/8"=1 '-0" I 1 �I I I I I I� o <br /> j------�-----,-j------�-----t---- ;,- �.� o <br /> �I I I i I I� m <br /> , , , , � � , <br /> �� 1 M280� 1 M281 �1 M282 r1 M283 ��M284 �M�� <br /> --- - -- -- - --- ---- u�u.Ui�ra --�'J <br /> � � <br /> � �I I I I I I� . <br /> BLDG 40-26 <br /> KEY PLAN <br /> SCALE; NONE N <br /> 4' 2' 0 4' 8' 12' 16' 20' . <br /> �������� <br /> www.brph.com Copyrighto 2017 <br /> PROFESSIONAL STAMP & SIGNATURE ��n� � 2 ���7 Architects, Engineers, Constructors <br /> AP P LI ES TO WO R K WITH I N TH E C LO U D ED ��NERA!Co��TC���CTI��CO. 19020 33rd Ave W,Suite 530 State of Washington � <br /> REVISION AREAS ONLY AS INDICATED 425n92�35 Oashington,98036 CertificateofAuthorization <br /> Architecture No.603235512 <br /> Engineering No.3137 <br /> SYM REVISIOP! BY APPROVED OATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTIT�E CURRENT REVISION SYMBOL DATE <br /> �� SAJ ACCEPTABILITY EAA 11�1 �� 16335 � 11 01 17 <br /> 0 P4 Tool Deck & Utility Design - Issue for Construction (WBS 16335) Eaa Fsc „�o,�,� �1oF WAS � THIS DESIGN AND/OR CHECKED PARTIAL FIRST FLOOR FIRE PROTECTION PLAN / / <br /> � ��� krt�,o� SPECIFICATION IS APPROVED CBJ 11 �� �� rir�e sHE�r <br /> � �.� APPROVED BY DEPT. OATE FSG 11 0> >7 FACTORY TRANSFORMATION - 777X FAMBU SI Modifications <br /> BOEi�� Freder k � � -- CHECKED 1 1 M 1 2 8� -9 21 <br /> -� �' APPRo�Eo B U I L D I N G 40�OZ V JOB N0. COMP N0. <br /> � � �� � „�E�����.��' WO 15�2899-921 <br /> �SroNAL ��G aPPRovEo MECHANICAL MASTER COL. M-N/9-11 EVERETT, Wq °wc No. 40-025-1 M284-921 <br />