My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2717 FEDERAL AVE EXXON MOBIL 2018-01-02 MF Import
>
Address Records
>
FEDERAL AVE
>
2717
>
EXXON MOBIL
>
2717 FEDERAL AVE EXXON MOBIL 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 8:26:02 AM
Creation date
11/5/2018 11:12:53 AM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2717
Tenant Name
EXXON MOBIL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />1 O: ExxonMobil Oil Corporation and American Distributing Company <br />FROM: Engineering/Public Services Department <br />DATE: September 9, 2011 <br />SUBJECT: P.W. Conditions (F) <br />PROPOSAL: Removing contaminated soil and repaving parking lot <br />LOCATION: 1000 Everett Avenue <br />A review of this project by the Engineering/Public Services Department indicates that the following <br />condit;ons should apply: <br />I. Insure that no excavation out and fill material impacts ^ity of Everett right-of-way from <br />Terminal Avenue eastward. Traffic control must per MUTCD standard. Provide axel spacing <br />and weight information for dump trucks for material haul. <br />2. All parking lot striping must comply with the City of Everett Standards.(#334A) <br />3. Temporary erosion control is required as noted in Appendix: `A" of the Excavation Work Plan <br />dated May 18, 2011. As a minimum any exposed piles of dirt must be covered, piles must be <br />bordered by silt fence except in paved areas or hard packed gravel areas where fencing is not <br />practical. Consult with the City Public Works inspector for particulars. <br />4. There is a 1" copper water service line approximately 2' to 3' deed running through the <br />excavation prism, it must be re -installed or rerouted at the direction of the City water <br />department. Additionally, there are two sewer lines in the same vicinity that will need <br />protection, consideration during construction, and repaired by City of Everett personnel at the <br />applicant's expense if damaged. <br />5. Work to be done per plan approved on 08-24-2011(copy attached). <br />6. City streets and alleys are to be kept clear of dirt and debris at all times during constriction. <br />Any dirt and/or debris tracked on to City streets must be immediately collected swept by <br />vacuum sweeper as needed daily and disposed off with the contaminated soils as required in <br />cleanup process. <br />7. After all necessary property owner and City approvals are met this work must be commenced <br />and completed in a timely manner in order to avoid conflicts with the City of Everett's work <br />within the casement. <br />8. Locate all City utilities by potholing-vactor method prior to excavation near City mains. <br />
The URL can be used to link to this page
Your browser does not support the video tag.