Laserfiche WebLink
PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425)257-8810 <br />Date: 6/3/2010 <br />Public Works Permit M PW1006-002 <br />Buildinq Permit #; <br />Planninq Reference #: <br />Public Works Fee $: <br />Other $: <br />OWNER NAME AND ADDRESS: <br />APPLICANT NAME AND ADDRESS: <br />CITY OF EVERETT <br />AMEC E & E <br />3200 CEDAR ST <br />EVERETT WA 98201 <br />L wv G Fp�fAal <br />PHONE: <br />PHONE: <br />TAX PARCEL ID # <br />SITE ADDRESS: FEDERAL AVE (2717-2731) <br />DESCRIPTION OF PROPOSED WORK: <br />CUT STREET AND RESTORE SITE <br />ACROSS FEDERAL AVE. START 6/25/10 AT 6:30 PM AND END 6/28/10 AT 6:30 AM <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 F_ <br />4.Applicant shall notify the City Public Works contact (Heather Griffin, with Mark Sadler as backup) of their intent to <br />perform the project 3 working days in advance of any work. Applicant must also notify of any changes to their work <br />schedule to the Public Works contact. <br />5. Applicant must provide their project manager contact and a 24-hour contact number for the work. <br />6. Standard utility notification and locate process shall be done and followed. <br />7. Work must follow work plan as approved by Ecology dated May 17, 2010. <br />8. All spoils, pipelines, structures and water encountered during the work must be properly stored on private <br />property or properly disposed of No storage at any time is allowed within the ROW. Any water discharged to the <br />City storm or sewer systems must be permitted with a Discharge Al ,thorization from the City's Industrial <br />Pretreatment Work Group. <br />9. Applicant is required to pre -notify Kimberly Clark and arrange traffic and parking control on Federal Ave during <br />their work. Work must be done to coordinate KC work and access needs. <br />10. Applicant shall provide access to their work for the city inspector or consultant at all times. <br />11. If the Anomaly described per page 11 of work plan is to be left in place, Applicant shall inform city inspector <br />and/or consultant and make available for inspection. If Anomaly is left in place then as best as -built information and <br />mapping shall completed and submitted to city. Applicant shall remove the Anomaly if at all possible. <br />12. Backfill shall be done immediately; pavement restoration shall be done within 3 days of completion. <br />""See attached page for additional comments"" <br />-G�c -- /<Q <br />Ap r ce for Cons , Date <br />-lam /0 <br />FINAI INSPECTION Date <br />Approved as Constructed <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned ownerlapplicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public property damaged thereby. <br />ignature of Applicant Date <br />I. <br />$ 45.00 <br />6&162C `��.,.,. ✓y <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PEPMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />