From: Heather Griffin <br />Sent: Friday, June 11, 2010 12:13 PM <br />To: Mark Sadler; Kirk Brooks <br />Subject: RE: Added Conditions for Public Works ROW Permit for Exxon Mobil for Federal Ave Work <br />Both of your proposed comments for this permit look good to me. I think #5 below should also be applied to <br />any pipelines/structures, etc. pulled out of the ground. Please provide a copy of the final permit that is issued <br />so I cz n send it on to our consultant. <br />My understanding is that a City inspector will not be on -site for the weekend work just the City's <br />environmental consultant for witnessing the fuel line decommissioning. Is that right? Should the consultant <br />see something that requires City contact during the weekend who should he call? For instance what if they <br />fail to put in the trench dam prior to backfilling? Should he speak up and say something, call a City contact, or <br />just document what happened for City to enforce later? <br />.9Ceat6er Griffin l <br />SeniorrEngineer s <br />4'11611c'Works (Dept. D <br />425.257.7206, _- <br />From: Mark Sadler <br />Sent: Tuesday, June 08, 2010 6:37 PM <br />To: Kirk Brooks <br />Cc: Heather Griffin <br />Subject: Added Conditions for Public Works ROW Permit for Exxon Mobil for Federal Ave Work <br />Kirk, in addition to your conditions, please include the following as conditions for this ROW permit: <br />1. Applicant shall notify the City Public Works contact (Heather Griffin, with Mark Sadler as backup) of their intent <br />to perform the project 3 working days in advance of any work. Applicant must also notify of any changes to <br />their work schedule to the Public Works contact. <br />2. Applicant must provide their project manager contact and a 24-hour contact number for the work. <br />i 3. Standard utility notification and locate process shall be done end followed. <br />4. Work must follow work plan as approved by Ecology dated M y 17, 2010. <br />5.�t}spoils-and water- encountered during the work must be properly stored on private property or properly <br />'disposed of. No storage at any time is allowed within the ROW. Any water discharged to the City storm or <br />sewer systems must be permitted with a Discharge Authorization from the City's Industrial Pretreatment Work <br />Group. <br />6. Applicant is required to pre -notify Kimberly Clark and arrange traffic and parking control on Federal Ave during <br />their work. Work must be done to coordinate KC work and access needs. <br />7. Applicant shall provide access to their work for the city inspector or consultant at all times. <br />8. If the Anomaly described per page 11 of work plan is to be left in place, Applicant shall inform city inspector <br />and/or consultant and make available for inspection. If Anomaly is left in place then as best as -built information <br />and mapping shall completed and submitted to city. Applicant shall remove the Anomaly if at all possible. <br />9. Backfill shall be done immediately; pavement restoration shall be done within 3 days of completion. <br />1 I <br />QQQS�DiLS/ Pi�xli% 1j SfrUL7"ureS 4`horG�i47`er� ��2 <br />