Laserfiche WebLink
To: Kirk Brooks; Dennis Roberson <br />Subject: PORT OF EVERETT WATER LINE E. ENS!ON, PIER 3 <br />Gentlemen, <br />• All of this is a private system. We are currently checking for backflow protection through Bill Bruce. <br />• IF the Port ever envisions turning this system over to the City, it will not be accepted without the proper system <br />separation. For potable systems DOH strongly recommends 10' from outside edge to outside edge and requires a <br />minimum of 6'. COE construction standards also require 10'. <br />• We are surprised that the power is not encased but rather in buried conduit. <br />• It appears that the proposed water line is as close 3s 0' to tnp of bank. Are shoreline permits required? <br />• Since this is a private system, Utilities has no recommendations as to design or construction except for the previous <br />concerns about separation. <br />• As designed, the City would not accept this system and will require backflow prevention if it is not already in place. <br />I t�I <br />1 <br />