My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2730 FEDERAL AVE EVERETT SHIPYARD 2018-01-02 MF Import
>
Address Records
>
FEDERAL AVE
>
2730
>
EVERETT SHIPYARD
>
2730 FEDERAL AVE EVERETT SHIPYARD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2022 10:27:30 AM
Creation date
11/5/2018 11:30:01 AM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2730
Tenant Name
EVERETT SHIPYARD
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date: 10/31/2008 <br />Public Works Permit #: PWO810-021 <br />City of Everett Public Works Department <br />�y 3200 Cedar Street Buildinq Permit #; C0810-010 <br />Everett, WA 98201 Planninq Reference #: <br />(425) 257-8810 <br />Public Works Fee $: $ 45.00 <br />Other $: <br />k; OWNER NAME AND ADDRESS: I APPLICANT NAME AND ADDRESS: <br />PORT OF EVERETT <br />PO BOX 538 <br />EVERETT WA 98206 <br />PHONE: 8007297678 <br />AX PARCELID # 2905190030160 <br />DESCRIPTION OF PROPOSED WORK: <br />MODULAR OFFICE FOR EVERETT SHIPYARD <br />PHONE: <br />SITE ADDRESS: 2730 FEDERAL AVE <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />4. Pave driveway access <br />Apppeqd for Cons ti Date <br />zo 0 <br />INAL INSPVCTION Date <br />Aooroved as Constructed <br />n <br />3: <br />W <br />m <br />m <br />r <br />h+y <br />o <br />o <br />o <br />�Dz <br />;rDo <br />LlL718a2�8S � <br />a <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same u on notice from the City and to replace <br />public pr a eby. <br />Signature of <br />It, <br />Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSU0411[11HEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.