Laserfiche WebLink
['aec 2 of 3 <br /> Jir:i, <br /> That is exactly what we needed. I will let our Inspectors know that the scope of work on the <br /> drawings has been revised. <br /> Can yc•� clarify if the Sale Prohibition Covenant,o�ly applies to Building H, or all of the <br /> buildings in the development? I assumed it was just for Building H, but in reading over it, it <br /> appears to include several parcels. This will help for the next round ot permit submittals for the <br /> remainder of the buildings. Thanks so much! <br /> The permits for Building H and the parking lot lights are ready for pickup. Our Permit <br /> Technicians can be reached at 425-257-8810 to review fees associated with the electric�+l and <br /> building submittals, which would have to be picked up before 4pm during the week. No new <br /> fees have been assessed, based on our conversations today. —Meg <br /> Me.g�i(a.i�ry <br /> �1a.n,s�£Kaen;,ne.r <br /> City of Evemtt <br /> 3�(7U Cednr SVccl <br /> f m�u.lt,LNA E'F701 <br /> P h'a 25-257 OG 1_; <br /> FnF:425-257-1ii":t�. <br /> wvrvcwemtlwaun�IdnlaulLaspx?i0=;76 <br /> From: Jim Kessler[mailto:7im_KesslerC�marxokubo.com] <br /> Sent: Wednesday, May 09, Z007 3:32 PM <br /> To: Meg Haley <br /> Subjed: Waterford Place <br /> Meq, <br /> I have summed-up the scope of work so you could see the changes. <br /> Work included in scope: <br /> • Remove LP siding at unit deck walls (3 sides not more than 250sqft for each deck) and <br /> replace with Cedar Lap siding. <br /> • Rernove existing waterproof ine;nbrane at unit decks and install new membrane wiih <br /> related flashings. <br /> . Remove existing unit deck rails and replace with new fiberglass deck rails. <br /> • Select replacement of L'.' siding where siding is swollen or damaged (T & M basis). <br /> • Remove and replace gutters and downspouts. <br /> • Replacement of woad membranes construr,ted at unit deck privacy walls where wood is <br /> deteriorated and/or damaged. <br /> . Installation of new soffit ai unit decks with proper ventilation. <br /> Work excluded from scope: <br /> • Replacement of all exterior cladding with Hardi products. <br /> • Replacement of breezeway handrails. <br /> • Installation of new carpet materials at breezeways. <br /> • P; inting of building exteriors. <br /> � Flushing details and installation around windows/doors. <br /> ;�oes this help clarify the change in scope? Please confirm that this will be sufficient. <br /> Thanks, <br /> lim I:rsslrr �'/q / <br /> � � <br /> i;')/?007 <br />