Laserfiche WebLink
'. <br /> Section 2 Effective January 1,2020: <br /> Section 2.1: Water and Sewer System Development Charges <br /> Total Water and <br /> Water System Sewer System Sewer System <br /> Development Development Development <br /> Meter Size Charge Charge Charges <br /> %" $4,072 $5,270 <br /> $9,341 <br /> 1" <br /> domestic/fire <br /> * $4,072 $5,270 $9,341 <br /> 1" $6800 $8,800 $15,600 <br /> 1 W' $13,559 $17,547 $31,106 <br /> 2" $21,702 $28,086 $49,789 <br /> 3" $40,718 $52,695 $93,413 <br /> 4" $67876 $87,843 $155,719 <br /> 6" $135,712 $175,633 $311,314 * <br /> 8" $217,147 $281,023 $498,170 <br /> 10" $312,181 $404,013 $716,195 <br /> • <br /> 12" $458,072 $592,820 $1,050,892 <br /> *Domestic/Fire combination meter for Single Family Residences and Duplexes <br /> reviewed under the International Residential Code,upsized due to the addition of a <br /> fire sprinkler system. <br /> The above table contains charges for inside City limits. Areas outside City limits, <br /> but connected to the City's water and sewer system, shall be charged the inside- <br /> City-limits charge plus a 25% surcharge. <br /> Section 2.2: Stormwater System Development Charge. In addition to water and sewer <br /> system development charges,there shall be a stormwater system development charge <br /> based on square footage of impervious area*: <br /> Development Type Stormwater System Development Charge <br /> New Construction Base Charge(11SU 52500 sf):$640 <br /> Additional charge for impervious area>2500 sf: $0.2559/sf <br /> Existing <br /> Development adding Calculated per square foot of added impervious surface area at <br /> new impervious $0.2559/sf <br /> surface area <br /> ISU=Impervious Surface Unit,defined as 2500 sf of impervious surface area. <br /> *Impervious Area as defined in the Washington State Stormwater Management Manual for <br /> Western Washington <br /> 3 <br /> 18 <br />