Laserfiche WebLink
10/10/2018 <br /> Changes to Ordinance <br /> Current Ordinance Proposed oposed Or drnance <br /> • Fees based on type of • Fees based on water meter size <br /> construction/commercial use (industry standard) <br /> • Stormwater fee embedded • Separate stormwater fee <br /> with sewer fee based on impervious area <br /> • Fees defined as special • Fees defined as system <br /> connection charges development fees <br /> 10/10/2010 477- <br /> ] <br /> City of Eve,Ell <br /> Water & Sewer Fee Comparison <br /> $20,000 <br /> $16,000 <br /> $12,000 <br /> $9,078 <br /> $8,000 — <br /> zs" <br /> _ <br /> ru <br /> $4,0000 <br /> 0 1= <br /> o <br /> _ a E <br /> 4J > N -0 <br /> $0 m w O w <br /> Water & Sewer System Development Fees <br /> (3/4" Meter Size) <br /> 10/10/201s <br /> City of Everett <br /> 26 <br />