McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 correctness of extensions of the prices per unit and the total price. If a discrepancy exists I <br /> 2 between the price per unit and the extended amount of any bid item, the price per unit will <br /> 3 control. If a minimum bid amount has been established for any item and the bidder's unit <br /> 4 or lump sum price is less than the minimum specified amount, the Contracting Agency will <br /> 5 unilaterally revise the unit or lump sum price, to the minimum specified amount and <br /> 6 recalculate the extension. The total of extensions, corrected where necessary, including <br /> 7 sales taxes where applicable and such additives and/or alternates as selected by the <br /> 8 Contracting Agency, will be used by the Contracting Agency for award purposes and to fix <br /> 9 the Awarded Contract Price amount and the amount of the contract bond. <br /> 10 <br /> I <br /> 11 1-03,1(1),ReF <br /> 12 1-03.1(1) Identical Bid Totals <br /> 13 (January 4, 2016 APWA GSP) <br /> I <br /> 14 <br /> 15 Revise this section to read: <br /> 16 <br /> I <br /> 17 After opening Bids, if two or more lowest responsive Bid totals are exactly equal, then <br /> 18 the tie-breaker will be the Bidder with an equal lowest bid, that proposed to use the <br /> 19 highest percentage of recycled materials in the Project, per the form submitted with the <br /> 20 Bid Proposal. If those percentages are also exactly equal, then the tie-breaker will be <br /> 21 determined by drawing as follows: Two or more slips of paper will be marked as follows: <br /> 22 one marked "Winner" and the other(s) marked "unsuccessful". The slips will be folded to I 23 make the marking unseen. The slips will be placed inside a box. One authorized <br /> 24 representative of each Bidder shall draw a slip from the box. Bidders shall draw in <br /> 25 alphabetic order by the name of the firm as registered with the Washington State <br /> 26 Department of Licensing. The slips shall be unfolded and the firm with the slip marked <br /> 27 "Winner" will be determined to be the successful Bidder and eligible for Award of the <br /> 28 Contract. Only those Bidders who submitted a Bid total that is exactly equal to the lowest <br /> 29 responsive Bid, and with a proposed recycled m aterials percentage that is exactly equal <br /> I <br /> 30 to the highest proposed recycled materials amount, are eligible to draw. <br /> 31 <br /> 32 COE -O3.?'.RT F <br /> 33 1-03.3 Execution of Contract <br /> 34 (October 1, 2005 APWA GSP) <br /> 35 <br /> I <br /> 36 Revise this section to read: <br /> 37 <br /> 38 Copies of the Contract Provisions, including the unsigned Form of Contract, will be <br /> I <br /> 39 available for signature by the successful bidder on the first business day following <br /> 40 award. The number of copies to be executed by the Contractor will be determined by the <br /> 41 Contracting Agency. <br /> 42 <br /> 1 <br /> 43 Within 20 calendar days after the award date, the successful bidder shall return <br /> 44 the signed Contracting Agency-prepared contract, an insurance certification as required <br /> 45 by Section 1-07.18, and a satisfactory bond as required by law and Section 1-03.4. <br /> I <br /> 46 Before execution of the contract by the Contracting Agency, the successful bidder shall <br /> 47 provide any pre-award information the Contracting Agency may require under Section 1- <br /> 48 02.15. <br /> I <br /> 49 <br /> 50 Until the Contracting Agency executes a contract, no proposal shall bind the Contracting <br /> 51 Agency nor shall any work begin within the project limits or within Contracting Agency- ' <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> 111 <br /> STATE FUND#GCB2316;COE WO#3644 10 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.