My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 materials and supplies, a DBE must "be responsible for negotiating price, <br /> 2 determining quality and quantity, ordering the material and installing and paying <br /> 3 for the material itself." The Contractor shall submit DBE Joint Check Request <br /> 4 Form for the Engineer approval prior to using a joint check. <br /> 5 <br /> 6 Material costs paid by the Contractor directly to the material supplier is not <br /> 7 allowed. If proper procedures are not followed or the Engineer determines that <br /> 8 the arrangement results in lack of independence for the DBE involved, no DBE <br /> 9 credit will be given for the DBE's participation as it relates to the material cost. <br /> 10 <br /> 11 Prompt Payment <br /> 12 Prompt payment to all subcontractors shall be in accordance with Section 1- <br /> 13 08.1. Prompt Payment requirements apply to progress payments as well as <br /> 14 return of retainage. <br /> 15 <br /> 16 Reporting <br /> 17 The Contractor and all subcontractors/suppliers/service providers that utilize <br /> 18 DBEs to perform work on the project, shall maintain appropriate records that will <br /> 19 enable the Engineer to verify DBE participation throughout the life of the project. <br /> 20 <br /> 21 Refer to Section 1-08.1 for additional reporting requirements associated with <br /> 22 this Contract. <br /> 23 <br /> 24 Decertification <br /> 25 When a DBE is "decertified" from the DBE program during the course of the <br /> 26 Contract, the participation of that DBE shall continue to count as DBE <br /> 27 participation as long as the subcontract with the DBE was executed prior to the <br /> 28 decertification notice. The Contractor is obligated to substitute when a DBE <br /> 29 does not have an executed subcontract agreement at the time of decertification. <br /> 30 <br /> 31 Consequences of Non-Compliance <br /> 32 Each contract with a Contractor(and each subcontract the Contractor signs with <br /> 33 a Subcontractor) must include the following assurance clause: <br /> 34 <br /> 35 The Contractor, subrecipient, or Subcontractor shall not discriminate on the <br /> 36 basis of race, color, national origin, or sex in the performance of this contract. <br /> 37 The Contractor shall carry out applicable requirements of 49 CFR Part 26 in the <br /> 38 award and administration of DOT-assisted contracts. Failure by the Contractor <br /> 39 to carry out these requirements is a material breach of this contract, which may <br /> 40 result in the termination of this contract or such other remedy as the recipient <br /> 41 deems appropriate, which may include, but is not limited to: <br /> 42 <br /> 111 <br /> 43 (1) Withholding monthly progress payments; <br /> 44 <br /> 45 (2) Assessing sanctions; <br /> 46 <br /> 47 (3) Liquidated damages; and/or <br /> 48 <br /> 49 (4) Disqualifying the Contractor from future bidding as non-responsible. <br /> 50 <br /> 111 <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 44 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.