Laserfiche WebLink
I <br /> 1 material on hand payment will be deducted on the estimate. Partial payment for materials III <br /> 2 on hand shall not constitute acceptance. Any material will be rejected if found to be faulty <br /> 3 even if partial payment for it has been made. II4 <br /> 5 1-C9.9,GRI <br /> 6 Payments <br /> 7 <br /> 8 1-09.9.FNSTLGR g <br /> 9 Section 1-09.9 is supplemented with the following: <br /> 10 <br /> I <br /> 11 1-09.9(Payments).RTF <br /> 12 1-09.9 Payments <br /> 13 (March 13, 2012 APWA GSP) <br /> I <br /> 14 <br /> 15 Delete the first four paragraphs and replace them with the following: <br /> 16 1 <br /> 17 The basis of payment will be the actual quantities of Work performed according to the <br /> 18 Contract and as specified for payment. <br /> 19 1 <br /> 20 The Contractor shall submit a breakdown of the cost of lump sum bid items at the <br /> 21 Preconstruction Conference, to enable the Project Engineer to determine the Work <br /> I <br /> 22 performed on a monthly basis. A breakdown is not required for lump sum items that <br /> 23 include a basis for incremental payments as part of the respective Specification. Absent <br /> 24 a lump sum breakdown, the Project Engineer will make a determination based on <br /> 25 information available. The Project Engineer's determination of the cost of work shall be <br /> I <br /> 26 final. <br /> 27 <br /> 28 Progress payments for completed work and material on hand will be based upon <br /> 29 progress estimates prepared by the Engineer. A progress estimate cutoff date will be <br /> 30 established at the preconstruction conference. <br /> I <br /> 31 <br /> 32 The initial progress estimate will be made not later than 30 days after the Contractor <br /> 33 commences the work, and successive progress estimates will be made every month <br /> I <br /> 34 thereafter until the Completion Date. Progress estimates made during progress of the <br /> 35 work are tentative, and made only for the purpose of determining progress payments. <br /> 36 The progress estimates are subject to change at any time prior to the calculation of the <br /> 37 final payment. I <br /> 38 <br /> 39 The value of the progress estimate will be the sum of the following: <br /> 40 1. Unit Price Items in the Bid Form —the approximate quantity of acceptable units of I j <br /> 41 work completed multiplied by the unit price. <br /> 42 2. Lump Sum Items in the Bid Form — based on the approved Contractor's lump sum t <br /> 43 breakdown for that item, or absent such a breakdown, based on the Engineer's <br /> 44 determination. <br /> 45 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site 11146 or other storage area approved by the Engineer. <br /> 47 4. Change Orders —entitlement for approved extra cost or completed extra work as <br /> 48 determined by the Engineer. <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> I <br /> STATE FUND#GCB2316; COE WO#3644 64 August 8, 2018 <br />