My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 The Contractor and the Contracting Agency mutually agree that those claims that total ' <br /> 2 $250,000 or less, submitted in accordance with Section 1-09.11 and not resolved by <br /> 3 nonbinding ADR processes, shall be resolved through litigation unless the parties mutually <br /> 4 agree in writing to resolve the claim through binding arbitration. <br /> 5 <br /> 6 1-1O.GR1 <br /> 7 Temporary Traffic Control , <br /> 8 <br /> 9 1-10.2.GR1 <br /> 10 Traffic Control Management <br /> 11 <br /> 12 .2(:: .G ` <br /> 13 General <br /> 14 <br /> 15 1-1E".2 E,.: "t'5 e>;.0 R. <br /> 16 Section 1-10.2(1) is supplemented with the following: <br /> 17 <br /> 18 1-1C,2(1).OPT1.GR <br /> 19 (January 3, 2017) <br /> 20 Only training with WSDOT TCS card and WSDOT training curriculum is recognized <br /> 21 in the State of Washington. The Traffic Control Supervisor shall be certified by one <br /> 22 of the following: <br /> 23 <br /> 24 The Northwest Laborers-Employers Training Trust <br /> 25 27055 Ohio Ave. <br /> 26 Kingston, WA 98346 <br /> 27 (360) 297-3035 <br /> 28 <br /> 29 Evergreen Safety Council <br /> 30 12545 135th Ave. NE <br /> 31 Kirkland, WA 98034-8709 <br /> 32 1-800-521-0778 <br /> 33 <br /> 34 The American Traffic Safety Services Association <br /> 35 15 Riverside Parkway, Suite 100 <br /> 36 Fredericksburg, Virginia 22406-1022 <br /> 37 Training Dept. Toll Free (877) 642-4637 <br /> 38 Phone: (540) 368-1701 <br /> 39 <br /> 40 1- ®,2(1).OPT2.GRa" <br /> 41 (January 5, 2015) <br /> 42 The primary TCS shall have a minimum of 500 hours of experience providing traffic <br /> 43 control as a TCS or traffic control labor on multilane highways with a speed limit of <br /> 44 55 mph or greater. The Contractor shall submit a certification of the TCS's <br /> 45 experience with the TCS designation. Documentation of experience shall be <br /> 46 available upon request by the Engineer. <br /> 47 <br /> 48 1..1C, .GR.f <br /> 49 Measurement , <br /> 50 <br /> 1 <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 66 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.