My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 1 <br /> 2 <br /> 3 D.i VISIOt2.GR2 <br /> 4 Division 2 <br /> 5 p �q Earthwork <br /> 67 2-0 ..1(3).C1f'42 <br /> 8 Removal of Pavement, Sidewalks, Curbs, and Gutters <br /> 10 2-02.3(3),INSELGR2 <br /> 9 <br /> 11 Section 2-02.3(3) is supplemented with the following: <br /> 12 <br /> 13 E-2--0 ,3()CP LD C) ' <br /> 14 (September 8, 1997) <br /> 15 The approximate thickness of the ***Asphalt Concrete *** pavement is *** between <br /> 16 3"-10" asphalt over concrete. See Sheet G8 of the Construction plans for road coring <br /> 17 results along Broadway ***. <br /> 18 <br /> 19 COE 2-02.3(3)V REMOVAL OF CURt3,R7 a= <br /> 20 Section 2-02.3(3)D is new with the following: <br /> 21 <br /> 22 (******) I <br /> 23 2-02.3(3)D Removal of Curb, Curb and Gutter <br /> 24 <br /> 25 Existing curbs shall be removed where shown on the plans or where encountered in <br /> 26 the work and designated by the Engineer. When pavement is being removed, the <br /> 27 curb shall be considered as pavement removal and the measurement for payment <br /> 28 thereof will be made to the back of the curb. <br /> 29 <br /> 30 Curb and gutter to be removed may be of cement concrete, or may be a cement <br /> 31 concrete curb with a brick gutter on a cement concrete back, or may be other <br /> 32 combinations of rigid materials. In any event it is intended that the full section shall <br /> 33 be removed. <br /> 34 <br /> 35 <br /> 36 <br /> 37 Section 2-02.3(3)E is new and is supplemented by the following: <br /> 38 <br /> 39 (******) <br /> 40 2-02.3(3)E Removal of Cement Concrete Sidewalks <br /> 41 <br /> 42 For removal purposes, all concrete slabs that average 4 inches or less in thickness <br /> 43 shall be considered as sidewalk removal. <br /> 44 <br /> 45 Cement concrete sidewalk shall be removed by sawcutting at the nearest scribe <br /> 46 marks beyond the neat line limits subject to the following requirements: <br /> 47 <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 68 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.