My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 5-04.3 Construction Requirements <br /> I 3 <br /> 4 5-04.3(1) Weather Limitations <br /> 5 Do not place HMA for wearing course on any Traveled Way beginning October 1st <br /> I 6 through March 31st of the following year without written concurrence from the Engineer. <br /> 7 <br /> 8 Do not place HMA on any wet surface, or when the average surface temperatures are <br /> I 9 less than those specified below, or when weather conditions otherwise prevent the <br /> 0 proper handling or finishing of the HMA. <br /> 11 <br /> 12 Minimum Surface Temperature for Paving <br /> Compacted Thickness Wearing Course Other Courses <br /> (Feet) <br /> ILess than 0.10 55°F 45.F <br /> 10.10 to .20 45.F 35.F <br /> More than 0.20 35.F 35.F <br /> I13 <br /> 14 5-04.3(2) Paving Under Traffic <br /> 15 When the Roadway being paved is open to traffic, the requirements of this Section <br /> 16 shall apply. <br /> 17 <br /> I <br /> 18 The Contractor shall keep intersections open to traffic at all times except when paving <br /> 19 the intersection or paving across the intersection. During such time, and provided that <br /> 20 there has been an advance warning to the public, the intersection may be closed for the <br /> I 21 minimum time required to place and compact the mixture. In hot weather, the Engineer <br /> 22 may require the application of water to the pavement to accelerate the finish rolling of <br /> 23 the pavement and to shorten the time required before reopening to traffic. <br /> I 24 <br /> 25 Before closing an intersection, advance warning signs shall be placed and signs shall <br /> 26 also be placed marking the detour or alternate route. <br /> I27 <br /> 28 During paving operations, temporary pavement markings shall be maintained throughout <br /> 29 the project. Temporary pavement markings shall be installed on the Roadway prior to <br /> I30 opening to traffic. Temporary pavement markings shall be in accordance with Section 8- <br /> 31 23. <br /> 32 <br /> I33 All costs in connection with performing the Work in accordance with these requirements, <br /> 34 except the cost of temporary pavement markings, shall be included in the unit Contract <br /> I 35 prices for the various Bid items involved in the Contract. <br /> 36 <br /> 37 5-04.3(3) Equipment <br /> I <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> I <br /> STATE FUND#GCB2316; COE WO#3644 75 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.