Laserfiche WebLink
I <br /> 111 1 INTRO.AP1 <br /> 2 INTRODUCTION <br /> 3 The following Amendments and Special Provisions shall be used in conjunction with the 2018 <br /> 4 Standard Specifications for Road, Bridge, and Municipal Construction. <br /> 5 <br /> 6 <br /> 7 AMENDMENTS TO THE STANDARD SPECIFICATIONS <br /> 8 The following Amendments to the Standard Specifications are made a part of this contract <br /> ' 9 and supersede any conflicting provisions of the Standard Specifications. For informational <br /> 10 purposes, the date following each Amendment title indicates the implementation date of the <br /> 11 Amendment or the latest date of revision. <br /> 12 <br /> 13 Each Amendment contains all current revisions to the applicable section of the Standard <br /> 14 Specifications and may include references which do not apply to this particular project. <br /> 111 15 <br /> 16 1-01.AP1 <br /> 17 Section 1-01, Definitions and Terms <br /> 18 August 6, 2018 <br /> 19 1-01.3 Definitions <br /> 20 The following new term and definition is inserted before the definition for"Shoulder": <br /> 21 <br /> 22 Sensitive Area — Natural features, which may be previously altered by human activity, <br /> 23 that are present on or adjacent to the project location and protected, managed, or <br /> 24 regulated by local, tribal, state, or federal agencies. <br /> 25 <br /> 26 The following new term and definition is inserted after the definition for"Working Drawings": <br /> I 27 <br /> 28 WSDOT Form — Forms developed and maintained by WSDOT that are required or <br /> 29 available for use on a project. These forms can be downloaded from the forms catalogue <br /> 30 at: <br /> 31 <br /> 32 http://wsdot.wa.gov/forms/pdfForms.html <br /> 33 <br /> 34 1-02.AP1 <br /> 35 Section 1-02, Bid Procedures and Conditions <br /> 36 April 2, 2018 <br /> 37 1-02.4(1) General <br /> 38 This section is supplemented with the following: <br /> 39 <br /> 40 Prospective Bidders are advised that the Contracting Agency may include a partially <br /> 41 completed Washington State Department of Ecology (Ecology) Transfer of Coverage <br /> 42 (Ecology Form ECY 020-87a) for the Construction Stormwater General Permit (CSWGP) <br /> 43 as part of the Bid Documents. When the Contracting Agency requires the transfer of <br /> 44 coverage of the CSWGP to the Contractor, an informational copy of the Transfer of <br /> 45 Coverage and the associated CSWGP will be included in the appendices. As a condition <br /> 46 of Section 1-03.3, the Contractor is required to complete sections I, Ill, and VIII of the <br /> 47 Transfer of Coverage and return the form to the Contracting Agency. <br /> 48 <br /> I <br />