Laserfiche WebLink
I <br /> I1 <br /> 2 The type of rollers to be used and their relative position in the compaction sequence <br /> I 3 shall generally be the Contractor's option, provided the specified densities are attained. <br /> 4 Unless the Engineer has approved otherwise, rollers shall only be operated in the static <br /> 5 mode when the internal temperature of the mix is less than 175°F. Regardless of mix <br /> 6 temperature, a roller shall not be operated in a mode that results in checking or cracking <br /> I <br /> 7 of the mat. Rollers shall only be operated in static mode on bridge decks. <br /> 8 <br /> I 9 <br /> 10 5-04.3(10)B HMA Compaction — Cyclic Density <br /> Low cyclic density areas are defined as spots or streaks in the pavement that are less <br /> 11 than 90 percent of the theoretical maximum density. At the Engineer's discretion, the <br /> 12 Engineer may evaluate the HMA pavement for low cyclic density, and when doing so will <br /> 13 follow WSDOT SOP 733. A $500 Cyclic Density Price Adjustment will be assessed for <br /> 14 any 500-foot section with two or more density readings below 90 percent of the <br /> I 15 theoretical maximum density. <br /> 16 <br /> 17 5-04.3(10)C Vacant <br /> I 18 <br /> 19 5-04.3(10)D HMA Nonstatistical Compaction <br /> 20 <br /> I21 5-04.3(10)D1 HMA Nonstatistical Compaction — Lots and Sublots <br /> 22 HMA compaction which is accepted by nonstatistical evaluation will be based on <br /> I 23 acceptance testing performed by the Contracting Agency dividing the project into <br /> 24 compaction lots. <br /> 25 <br /> I 26 A lot is represented by randomly selected samples of the same mix design that will be <br /> 27 tested for acceptance. A lot is defined as the total quantity of material or work produced <br /> 28 for each Job Mix Formula placed. Only one lot per JMF is expected. A sublot shall be <br /> I 29 equal to one day's production or 400 tons, whichever is less except that the final sublot <br /> 30 will be a minimum of 200 tons and may be increased to 800 tons. Testing for compaction <br /> 31 will be at the rate of 5 tests per sublot per WSDOT T 738. <br /> I 32 <br /> 33 The sublot locations within each density lot will be determined by the Engineer. For a lot <br /> 34 in progress with a CPF less than 0.75, a new lot will begin at the Contractor's request <br /> I 35 after the Engineer is satisfied that material conforming to the Specifications can be <br /> 36 produced. <br /> 37 <br /> I 38 HMA mixture accepted by commercial evaluation and HMA constructed under conditions <br /> 39 other than those listed above shall be compacted on the basis of a test point evaluation <br /> 40 of the compaction train. The test point evaluation shall be performed in accordance with <br /> I 41 instructions from the Engineer. The number of passes with an approved compaction <br /> 42 train, required to attain the maximum test point density, shall be used on all subsequent <br /> 43 paving. <br /> 1 <br /> 44 <br /> I <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> 1 STATE FUND#GCB2316; COE WO#3644 89 August 8, 2018 <br />