My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 j. The Bidder fails to submit an Underutilized Disadvantaged Business Enterprise <br /> I 3 Broker Agreement, if applicable, as required in Section 1-02.6, or if the <br /> 4 documentation that is submitted fails to demonstrate that the fee/commission is <br /> 5 reasonable as determined by the Contracting Agency; or <br /> 6 <br /> 1 7 k. The Bid Proposal does not constitute a definite and unqualified offer to meet the <br /> 8 material terms of the Bid invitation. <br /> 9 <br /> I 10 1-03.AP1 <br /> 11 Section 1-03, Award and Execution of Contract <br /> 12 January 2, 2018 <br /> I13 1-03.3 Execution of Contract <br /> 14 The first paragraph is revised to read: <br /> I 15 <br /> 16 Within 20 calendar days after the Award date, the successful Bidder shall return the <br /> 17 signed Contracting Agency-prepared Contract, an insurance certification as required by <br /> I 18 Section 1-07.18, a satisfactory bond as required by law and Section 1-03.4, the Transfer <br /> 19 of Coverage form for the Construction Stormwater General Permit with sections I, Ill, and <br /> 20 VIII completed when provided, and shall be registered as a contractor in the state of <br /> I 21 Washington. <br /> 22 <br /> 23 1-03.5 Failure to Execute Contract <br /> I 24 The first sentence is revised to read: <br /> 25 <br /> 26 Failure to return the insurance certification and bond with the signed Contract as required <br /> 27 in Section 1-03.3, or failure to provide Disadvantaged, Minority or Women's Business <br /> 28 Enterprise information if required in the Contract, or failure or refusal to sign the Contract, <br /> 29 or failure to register as a contractor in the state of Washington, or failure to return the <br /> 30 completed Transfer of Coverage for the Construction Stormwater General Permit to the <br /> I 31 Contracting Agency when provided shall result in forfeiture of the proposal bond or <br /> 32 deposit of this Bidder. <br /> 33 <br /> I 34 1-05.AP1 <br /> 35 Section 1-05, Control of Work <br /> 36 August 6, 2018 <br /> I37 1-05.5 Vacant <br /> 38 This section, including title, is revised to read: <br /> I 39 <br /> 40 1-05.5 Tolerances <br /> 41 Geometrical tolerances shall be measured from the points, lines, and surfaces defined in <br /> I 42 Contract documents. <br /> 43 <br /> 44 A plus (+) tolerance increases the amount or dimension to which it applies, or raises a <br /> 45 deviation from level. A minus (-) tolerance decreases the amount or dimension to which <br /> I46 it applies, or lowers a deviation from level. Where only one signed tolerance is specified <br /> 47 (+ or-), there is no specified tolerance in the opposing direction. <br /> 48 <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.