Laserfiche WebLink
I <br /> I1 Asphalt for prime coat will be measured by the ton in accordance with Section 1-09.2. <br /> 2 <br /> I 3 Prime coat aggregate will be measured by the cubic yard, truck measure, or by the ton, <br /> 4 whichever is designated in the Proposal. <br /> 5 <br /> I 6 Asphalt for fog seal will be measured by the ton, as provided in Section 5-02.4. <br /> 7 <br /> 8 Longitudinal joint seals between the HMA and cement concrete pavement will be <br /> 1 9 measured by the linear foot along the line and slope of the completed joint seal. <br /> 10 <br /> 11 Planing bituminous pavement will be measured by the square yard. <br /> 12 <br /> 13 Temporary pavement marking will be measured by the linear foot as provided in Section <br /> I 14 8-23.4. <br /> 15 <br /> 16 Water will be measured by the M gallon as provided in Section 2-07.4. <br /> I17 <br /> 18 5-04.5 Payment <br /> I 19 Payment will be made for each of the following Bid items that are included in the <br /> 20 Proposal: <br /> 21 <br /> I 22 "HMA Cl. PG ", per ton. <br /> 23 <br /> 24 "HMA for Approach Cl. PG ", per ton. <br /> 1 25 <br /> 26 "HMA for Preleveling Cl. PG ", per ton. <br /> I 27 <br /> 28 "HMA for Pavement Repair Cl. PG ", per ton. <br /> 29 <br /> 30 "Commercial HMA", per ton. <br /> 31 <br /> I 32 The unit Contract price per ton for "HMA Cl. PG ", "HMA for Approach Cl. <br /> 33 PG ", "HMA for Preleveling Cl. PG ", "HMA for Pavement Repair Cl. PG <br /> 34 ", and "Commercial HMA" shall be full compensation for all costs, including anti- <br /> 35 stripping additive, incurred to carry out the requirements of Section 5-04 except for those <br /> 36 costs included in other items which are included in this Subsection and which are <br /> 37 included in the Proposal. <br /> 38 <br /> 1 39 "Preparation of Untreated Roadway", per mile. <br /> 40 <br /> I <br /> 41 <br /> 42 The unit Contract price per mile for "Preparation of Untreated Roadway" shall be full pay <br /> for all Work described under 5-04.3(4) , with the exception, however, that all costs <br /> 43 involved in patching the Roadway prior to placement of HMA shall be included in the unit <br /> I <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> ISTATE FUND#GCB2316; COE WO#3644 99 August 8, 2018 <br />