My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 Asphalt for prime coat will be measured by the ton in accordance with Section 1-09.2. <br /> 2 <br /> I 3 Prime coat aggregate will be measured by the cubic yard, truck measure, or by the ton, <br /> 4 whichever is designated in the Proposal. <br /> 5 <br /> I 6 Asphalt for fog seal will be measured by the ton, as provided in Section 5-02.4. <br /> 7 <br /> 8 Longitudinal joint seals between the HMA and cement concrete pavement will be <br /> 1 9 measured by the linear foot along the line and slope of the completed joint seal. <br /> 10 <br /> 11 Planing bituminous pavement will be measured by the square yard. <br /> 12 <br /> 13 Temporary pavement marking will be measured by the linear foot as provided in Section <br /> I 14 8-23.4. <br /> 15 <br /> 16 Water will be measured by the M gallon as provided in Section 2-07.4. <br /> I17 <br /> 18 5-04.5 Payment <br /> I 19 Payment will be made for each of the following Bid items that are included in the <br /> 20 Proposal: <br /> 21 <br /> I 22 "HMA Cl. PG ", per ton. <br /> 23 <br /> 24 "HMA for Approach Cl. PG ", per ton. <br /> 1 25 <br /> 26 "HMA for Preleveling Cl. PG ", per ton. <br /> I 27 <br /> 28 "HMA for Pavement Repair Cl. PG ", per ton. <br /> 29 <br /> 30 "Commercial HMA", per ton. <br /> 31 <br /> I 32 The unit Contract price per ton for "HMA Cl. PG ", "HMA for Approach Cl. <br /> 33 PG ", "HMA for Preleveling Cl. PG ", "HMA for Pavement Repair Cl. PG <br /> 34 ", and "Commercial HMA" shall be full compensation for all costs, including anti- <br /> 35 stripping additive, incurred to carry out the requirements of Section 5-04 except for those <br /> 36 costs included in other items which are included in this Subsection and which are <br /> 37 included in the Proposal. <br /> 38 <br /> 1 39 "Preparation of Untreated Roadway", per mile. <br /> 40 <br /> I <br /> 41 <br /> 42 The unit Contract price per mile for "Preparation of Untreated Roadway" shall be full pay <br /> for all Work described under 5-04.3(4) , with the exception, however, that all costs <br /> 43 involved in patching the Roadway prior to placement of HMA shall be included in the unit <br /> I <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> ISTATE FUND#GCB2316; COE WO#3644 99 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.