My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 <br /> 3 DIVISION?.GRi <br /> 4 Division 7 <br /> 5 Drainage Structures, Storm Sewers, Sanitary <br /> 6 Sewers, Water Mains, and Conduits <br /> 7 <br /> 8 COE 7-04 TESTING STORM PIPE.RTF <br /> 9 7-04.5 Payment <br /> 10 <br /> 11 (******) <br /> I 12 <br /> 13 Section 7-04.5 is supplemented with the following: <br /> 14 <br /> ' 15 The unit Contract price per linear foot for storm sewer pipe of the kind and size specified shall <br /> 16 also include all labor, material and equipment required to conduct the testing required in <br /> 17 Section 7-04.3(1). <br /> 18 <br /> 19 CUE 7-053' )SOLID LID.RTF <br /> 20 7-05.3(5) Furnish and Install Solid Lid <br /> 21 <br /> 22 Section 7-05.3(5) is new and is supplemented with the following: <br /> 23 <br /> 1 24 (******) <br /> 25 <br /> 26 Where shown on the plans, the Contractor shall install new solid lid on existing catch basin, <br /> 27 inlet or Manhole. The solid lid shall conform to Section 9-05.15 (2) of the Standard <br /> 28 Specifications and to COE Standard Drawing #410. <br /> 29 <br /> I30 The proper text denotation of either "DRAIN", "SEWER", "WATER" shall be used <br /> 31 appropriately. <br /> 32 <br /> 1 33 7-05.3 Construction Requirements <br /> 34 Section 7-05.3 is supplemented with the following: <br /> 35 <br /> 36 (******) <br /> 37 <br /> 38 The custom cover for the water vault shall compose of two lids. Each lid has an <br /> 39 approximate measurement of 331/4" x 35 1/2". It is the contractor's responsibility to verify <br /> 40 exact dimensions for proper fit prior to bidding and manufacturing. <br /> 41 Each lid shall have a minimum of one locking latch with a 3/8" Pentahead bolt, and hinged <br /> 42 at the opposite end. Each lid shall have a spring assisted door with a recessed lift handle, <br /> 43 and shall be able to fully open to 180°. <br /> ' 44 Each lid shall have a hot-dipped galvanized finish with a non-skid top after fabrication. <br /> 45 <br /> 46 <br /> I <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 109 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.