My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 1 <br /> 2 The subbase for curb and gutter sections shall be compacted to 95% density at <br /> 3 optimum moisture content before placing the curb and gutter. <br /> 4 <br /> 5 The top of the finished concrete shall not deviate more than 1/8" in 10', nor the <br /> 6 alignment 1/4" in 10'. <br /> 7 <br /> 8 Cement concrete curbs shall be constructed where shown on plans or as directed <br /> 9 by the Engineer in accordance with Standard Drawing Nos. 307, 308, 309, and 310. <br /> 10 <br /> 11 At locations shown on the construction plans, the Contractor shall construct storm <br /> 12 drainage frames and grates into cement concrete curb and gutter, per Standard <br /> 13 Drawings Nos. 407 and 411. <br /> 14 <br /> 15 8-04.5 Payment <br /> 16 <br /> 17 Section 8-04.5 is supplemented with the following: <br /> 18 <br /> 19 "Cement Concrete Curb and Gutter Type A-1," per linear foot. <br /> 20 "Cement Concrete Curb Type ," per linear foot. <br /> 21 "Extruded Asphalt Concrete Curb," per linear foot. <br /> 22 "Extruded Cement Concrete Curb," per linear foot. <br /> 23 <br /> 24 "Cement Concrete Curb and Gutter Type A-1", "Cement Concrete Curb Type <br /> 25 "Extruded Asphalt Concrete Curb", and "Extruded Cement Concrete Curb", per linear foot <br /> 26 shall be full compensation for all labor, equipment, materials and incidentals, including <br /> 27 forms, necessary to perform the work. Installation of curb depressions for driveway cuts <br /> 28 and wheelchair ramps shall be incidental to these items and no separate payment will be <br /> 29 made. <br /> 111 <br /> 30 <br /> 31 <br /> 32 COE C-05 PRIVATE`ATE 111PROVEME`T: T <br /> 33 SECTION 8-05 PRIVATE IMPROVEMENTS (NEW SECTION) <br /> 34 (******) <br /> 35 <br /> 36 VACANT SECTION 8-05 OF THE STANDARD SPECIFICATIONS IS REPLACED BY THE <br /> 37 FOLLOWING: <br /> 38 <br /> 39 8-05.1 Description <br /> 40 This work shall consist of removing and restoration of certain private improvements to <br /> 41 conform to the new requirements due to construction. <br /> 42 <br /> 43 8-05.2 Existing Private Improvements Restoration <br /> 44 <br /> 45 As directed by the Engineer, existing private improvements that require relocation to <br /> 46 accommodate the new construction, shall be restored in a location acceptable to the <br /> 47 property owner and the Engineer. The Contractor shall protect and preserve from any <br /> 48 damage or destruction all private property whether required to be removed and relocated <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 116 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.