My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 8-21,2(9-06,16),UPT',GR8 <br /> 2 (January 3, 2011) <br /> 3 Perforated Steel Square Sign Post System <br /> I <br /> 4 Where noted in the Plans, steel sign post systems shall be square, pre-punched <br /> 5 galvanized steel tubing, that are NCHRP 350 Test Level 3 Certified and FHWA <br /> 6 approved. The steel sign post system shall include all anchor sleeves, and other <br /> I 7 hardware required for a complete sign installation. <br /> 8 <br /> 9 System Acceptance <br /> I <br /> 10 <br /> 11 Systems listed in the current QPL will be accepted per the QPL approval code. <br /> Systems not listed in the QPL will be accepted based on a Supplier's Certificate of <br /> 12 Compliance. The Supplier's Certificate of Compliance will be a contract specific letter <br /> 13 from the supplier stating the system is NCHRP 350 Test Level 3 compliant. <br /> 14 <br /> 15 8-21,2(9-28.i 1),GR'8 <br /> I 16 Hardware <br /> 17 Section 9-28.11 is supplemented with the following: <br /> 18 <br /> 19 8-21,2(9-28,14),x.'s8 <br /> 20 Sign Support Structures <br /> 21 Section 9-28.14 is supplemented with the following: <br /> 22 <br /> I <br /> 23 8-21,2(9-28,14(2)),x.8' <br /> 24 Steel Structures and Posts <br /> 25 Section 9-28.14(2) is supplemented with the following: <br /> I 26 <br /> 27 CWH 8-22 PAINT MARKING-Type DST": <br /> 28 8-22 PAVEMENT MARKING <br /> 1 30 <br /> 31 Section 8-22 of the Standard Specification is supplemented by the following: <br /> 32 <br /> I 33 8-22.2 Materials <br /> 34 <br /> 35 All plastic marking shall be Type D. <br /> I 36 <br /> 37 8-22.3 Construction Requirements <br /> 38 <br /> 39 Pavement markings shall be installed in accordance with Section 8-22.3 of the Standard <br /> ' 40 Specifications with the following modifications: <br /> 41 <br /> 42 1) All Stop Line shall be 24" wide Type D extruded plastic flat line. Spray Type D is <br /> I <br /> 43 not allowed. <br /> 44 2) All Crosswalk Line shall be solid white lines, 24"wide, installed in accordance with <br /> I <br /> 45 <br /> 46 City of Everett Standard Drawing No. 721 and shall be Type D extruded plastic <br /> flat line. Spray Type D is not allowed. <br /> I <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> ISTATE FUND#GCB2316; COE WO#3644 131 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.