My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I Local Agency Name <br /> City of Everett <br /> Local Agency Subcontractor List <br /> Local Agency Address <br /> I Prepared in compliance with RCW 39.30.060 as amended <br /> 2930 Wetmore <br /> Everett, Washington 98201 <br /> To Be Submitted with the Bid Proposal <br /> Project Name N. Broadway Transit Improvement Project <br /> Failure to list subcontractors with whom the bidder, if awarded the contract, will directly subcontract for <br /> I performance of the work of heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 <br /> RCW, and electrical, as described in Chapter 19.28 RCW or naming more than one subcontractor to perform <br /> the same work will result in your bid being non-responsive and therefore void. <br /> I Subcontractor(s)with whom the bidder will directly subcontract that are proposed to perform the work of heating, <br /> ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical as described in Chapter <br /> 19.28 RCW must be listed below. The work to be performed is to be listed below the subcontractor(s) name. <br /> To the extent the Project includes one or more categories of work referenced in RCW 39.30.060, and no <br /> subcontractor is listed below to perform such work,the bidder certifies that the work will either(1) be <br /> performed by the bidder itself, or(ii) be performed by a lower tier subcontractor who will not contract directly <br /> ' with the bidder. <br /> Subcontractor Name <br /> ti cL �c <br /> v .,ct quit � EafZ N_� <br /> � , enc _--------•-----_ _.._ _— <br /> I <br /> Work to be Performed tv ( <br /> Subcontractor Name _ sl_ ! ___Liei is,1 J�t1j.e�}2r-/ �n C__ <br /> Work to be Performed —1J.,,.b.'.y <br /> I Subcontractor Name _S �u)_LL._ C-111-16-62-1. 1n._C._.___ __ .___,_ ___. _...----u___ _._ <br /> Work to be Performed <br /> Subcontractor Name __________F._._____._—._ _—_•_.___. _ ___.____—._.__w_..__._ <br /> Work to be Performed - _._..___.— -+ — —. . ._..___.____—=T I W <br /> Subcontractor Name ___v_ __.__ __.— _ �___.__._ <br /> Work to be Performed _ <br /> Bidder's are notified that is the opinion of the enforcement agency that PVC or metal conduit,junction boxes, etc, are <br /> I considered electrical equipment and therefore considered part of electrical work, even if the installation is for future use <br /> and no wiring or electrical current is connected during the project. <br /> I SR DOT Farm 271-01.`iA FF <br /> Revisal 0R'2012 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.