My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Instructions for Underutilized Disadvantaged Business <br /> Enterprise Utilization Certification Form <br /> I Box 1: Name of Bidder(Proposal holder) submitting Bid. <br /> Box 2: Name of the Project. <br /> Column 1: Name of the Underutilized Disadvantaged Business Enterprise(UDBE). UDBE Firms can be found using the <br /> I search tools under the Firm Certification section of the Diversity Management and Compliance System web <br /> page httos:/iwsdot.diversitycornoliance.corn Repeat the name of the UDBE for each Project Role that will be <br /> performed. <br /> Column 2: The Project Role that the UDBE will be performing as follows, <br /> I • Prime Contractor <br /> • Subcontractor <br /> • Subcontractor(Force Account) <br /> I • Work sublet as Force Account must be listed separately. <br /> • Manufacturer <br /> • Regular Dealer <br /> • Work sublet to a Regular Dealer must be listed separately. <br /> • Regular Dealer status must be approved prior to Bid submittal by the Office of Equal Opportunity, <br /> Washington State Department of Transportation, on each Contract. <br /> • Broker <br /> I • Work sublet to a Broker must be listed separately. <br /> List each project role to be performed by a single UDBE individually on a separate row(s). The role is used to <br /> determine what portion of the amount to be subcontracted (Column 4) may be applied toward meeting the goal <br /> (column 5). <br /> I <br /> Column 3: Provide a description of the work to be performed by the UDBE.The work to be performed must be consistent <br /> with the Certified Business Description of the UDBE provided at the Diversity Management and Compliance <br /> System web page httos://wsdot.diversitycompliance.com <br /> • A Bidder subletting a portion of a bid item shall state"Partial" and describe the Work that is included. <br /> I <br /> • For example;"Electrical (Partial)—Trenching". <br /> • "Mobilization"will not be accepted as a description of Work. <br /> Column 4: List the total amount to be subcontracted to each UDBE for each Project Role they are performing. <br /> I <br /> Column 5: This is the dollar amount for each line listed in the certification that the prime intends to apply towards meeting <br /> the COA Contract goal. It may be that only a portion of the amount subcontracted to a UDBE in Column 4 is <br /> eligible to be credited toward meeting the goal See Note 1, Note 2, Note 3.The Contracting Agency will utilize <br /> the sum of this column (Box 4)to determine whether or not the bidder has met the goal. In the event of an <br /> I <br /> arithmetic error in summing column 5 or en error in making appropriate reductions in the amounts in column <br /> four, See Note 1, Note 2, Note 3, then the mathematics will be corrected and the total (Box 4)will be revised <br /> accordingly. <br /> I Note 1: For Work sublet as Force Account the bidder may only claim 50% of the amount subcontracted (Column 4) <br /> towards meeting the goal(Column 5). This information will be used to demonstrate that the UDBE contract <br /> goal is met at the time that the bidder submits their bid. For example; amount sublet as force account= <br /> $100,000 (Column 4)equates to($100,000 X 50%) _ $50,000 (Column 5)to be applied towards the goal. <br /> I Note 2: For Work sublet to a Regular Dealer the bidder may only claim 60% of the cost of the materials or supplies <br /> (Column 4)towards meeting the goal (Column 5). For example; Material cost= $100,000(Column 4) equates <br /> to ($100.000 X 60%)=$60,000 (Column 5)to be applied towards the goal <br /> Note 3: For Work sublet to a Broker the bidder may only claim the fees paid to a Broker towards meeting the <br /> I goal (Column 4). For example; amount sublet to a broker= $100,000(Column 4) equates to ($100,000 X <br /> reasonable fee%) =$(Column 5)to be applied towards the goal. <br /> Box 3: Box 3 is the COA Contract goal which is the minimum required UDBE participation. The goal stated in the <br /> Contract will be in terms of a dollar amount or a percentage in the Contract. When expressed as a percentage <br /> I you must multiply the percentage times the sum total of all bid items as submitted in the Bidder's Proposal to <br /> determine the dollar goal and write it in Box 3. In the event of an error in this box,the Contracting Agency will <br /> revise the amount accordingly. <br /> Box 4: Box 4 is the sum of the values in column 5. This value must equal or exceed the COA Contract goal <br /> l <br /> amount written in Box 3 or; <br /> Box 5. Check Box 5 if insufficient UDBE Participation has been achieved and a good faith effort is required. Refer to <br /> the subsection titled. Selection of Successful Bidder/Good Faith Efforts (GFE) in the Contract. <br /> See the Disadvantaged Business Enterprise Participation specification in the Contract for more , <br /> information. <br /> DOT Form 272-056U <br /> IRevised 0212018 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.