My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i .. <br /> ARM <br /> APWA-WA Division 1 Committee rev. 1/8/2016 <br /> Proposal for Incorporating Recycled Materials into the Project <br /> In compliance with a new law that went into effect January 1, 2016 (SHB1695), the Bidder shall <br /> propose below, the total percent of construction aggregate and concrete materials to be <br /> ' incorporated into the Project that are recycled materials. Calculated percentages must be within <br /> the amounts allowed in Section 9-03.21(1)E, Table on Maximum Allowable Percent (By Weight) <br /> of Recycled Material, of the Standard Specifications. <br /> Proposed total percentage: b/0 percent. <br /> Note: Use of recycled materials is highly encouraged within the limits shown above, but does <br /> ' not constitute a Bidder Preference, and will not affect the determination of award, unless two or <br /> more lowest responsive Bid totals are exactly equal, in which case proposed recycling <br /> percentages will be used as a tie-breaker, per the APWA GSP in Section 1-03.1 of the Special <br /> Provisions. Regardless, the Bidder's stated proposed percentages will become a goal the <br /> ' Contractor should do its best to accomplish. Bidders will be required to report on recycled <br /> materials actually incorporated into the Project, in accordance with the APWA GSP in Section <br /> 1-06.6 of the Special Provisions. <br /> Bidder: McCann Construction Enterprises, Inc. <br /> Signature of Authorized Official: � 43 <br /> ' Date: 09/11/18 <br /> 1 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />
The URL can be used to link to this page
Your browser does not support the video tag.