Laserfiche WebLink
fees) suffered by the City if the City is determined to be solely or concurrently negligent, and if the City <br /> suffers any loss or must pay or defend against any such claim, suit, demand or damage as a result of such <br /> breach. <br /> I 9. Waiver of Industrial Insurance Immunity. Contractor waives any right of contribution against the <br /> City. It is agreed and mutually negotiated that in any and all claims against the City,its agents or employees, <br /> the Contractor, a subcontractor, anyone directly or indirectly employed by the Contractor or subcontractor, <br /> ' or anyone for whose acts any of them may be liable, the defense and indemnification obligations hereunder <br /> shall not be limited in any way by any limitation on the amount of damages, compensation, or benefits <br /> payable by or for the Contractor or any subcontractor under industrial worker's compensation acts, <br /> disability benefit acts, or other employees' benefit acts. Contractor's and City's signatures hereto indicate <br /> specific waiver of Contractor's industrial insurance immunity in order to fulfill this indemnity. Solely for <br /> the purpose of indemnification and defense as provided in this Contract,the Contractor specifically waives <br /> any immunity under the State Industrial Insurance Law, Title 51 RCW. The Contractor expressly <br /> ' acknowledges that this waiver of immunity under Title 51 RCW was the subject of mutual negotiation and <br /> was specifically entered into pursuant to the provisions of RCW 4.24.115. <br /> 10. Repair of Damage. The Contractor agrees to repair and replace all property of the City and all property <br /> of others damaged by it, its employees, subcontractors, suppliers and agents. <br /> 11. Pre-Bid Inspection and Risk of Loss. It is understood that the whole of the work under this contract <br /> is to be done at the Contractor's risk and that: (1) prior to submitting its proposal or bid, it became familiar <br /> with the conditions of excavation, subsurface, backfill, materials, climatic conditions, location, traffic, and <br /> other contingencies that may affect the work and has made its bid or proposal accordingly and (2) that it <br /> assumes the responsibility and risk of all loss or damage to materials or work which may arise from any <br /> cause whatsoever prior to completion. <br /> 12. Headings for Convenience Only. The headings in this document are for convenience only, and shall <br /> not be used or considered to interpret or construe this document. <br /> 13. Effective Date. This Contract is effective as of the date of the last person to sign it, and may be <br /> ' executed in multiple counterparts, each of which shall be deemed an original. <br /> 1 <br /> N. Broadway Transit Improvement Project Division C August 7,2018 <br /> State Fund#: GCB2316;COE WO#3644 Page 3 of 6 <br />