My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 <br /> ® NOTES <br /> © © 1. EQUALS WIDTH OF DRIVEWAY AT PROPERTY LINE. <br /> )1010... "" """"" 2. 3/8"WIDE FULL DEPTH EXPANSION JOINT. <br /> v <br /> Q 3. 3/8"WIDE FULL DEPTH EXPANSION JOINT IF NOTE <br /> 1 ABOVE IS 15'OR GREATER. <br /> e 4. WITHIN THE CITY RIGHT-OF-WAY THE DRIVEWAY <br /> ASHALL BE SURFACED WITH ASPHALT OR <br /> Z <br /> O CONCRETE. <br /> A9 � * © 5. THE DRIVEWAY RAMP INCLUDING WING RAMPS <br /> `6� ` SHALL BE CONCRETE COMMERCIAL MIX AS CALLED <br /> 'Zy� / OUT T ICK AN STANDARD SPECIFICATIONS,A " <br /> OF 6"THICK AND PLACED ON A MINIMUM OF 2" <br /> 499f 41 TO 95CRUSHED MS URFACING MUM DENSITY BASE COURSE COMPACTED <br /> '9 d -, ' ".".`. 6. MAINTAIN 1/2"LIP AT GUTTER. <br /> 0 <br /> m --Alzoo...63,__ LOWERING BACK OF LENGTH OF TRANSITION <br /> SIDEWALK"A"4345,- <br /> ,yyr <br /> o9,y 3 INCHES 3 FEET <br /> g, \ 4 INCHES 4 FEET <br /> 5 INCHES 5 FEET <br /> 5'MIN(SW) 5'MIN(SW) <br /> V <br /> X <br /> 2' 3'MIN VARIES 3'MIN <br /> VARIES <br /> o 0 2% .1 0 <br /> 2% <br /> i 111: --vi AMM.— ---_ <br /> g PAVEMENT - ... <br /> PAVEMENT . . _ ,.. :..; <br /> it 2'MIN CRUSHED 2"MIN CRUSHED <br /> N SURFACING SURFACING <br /> 5 BASE COURSE BASE COURSE <br /> CITY OF EVERETT <br /> SECTION A A SECTION B B EVE Err PUBLIC WORKS DEPARTMENT <br /> o USING TYPE A-1 CURB �� <br /> g o USING MONOLITHIC CURB&SW Srw"SASS IroA+no I PAUG�VINpM I°" p4 <br /> arse 12017 <br /> CEMENT CONCRETE <br /> i ? DRIVEWAY RAMP TYPE-2 316 <br /> 1 i <br /> NI MN 11111111 111111 n 1101 11111 MN MI NS NIS 11111 al MS 111111 N 1011 N 11111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.