My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MI MI M I OM 1111111 S M I NB NB MI 1 MI M NM 1 <br /> NOTES <br /> FINAL JOINT MUST <br /> BE SAWCUT 1. ALL TRENCHES IN ROADWAY AREAS SHALL BE <br /> BACKFILLED AND PATCHED WITH TEMPORARY <br /> EXISTING ASPHALT (2"MII� ASPHALT AT THE END OF EACH WORK DAY,UNLESS <br /> ASPHALT CONCRETE <br /> CONCRETE TO MATCH EXISTING HICKNESS PERMISSION IS GRANTED TO DO OTHERWISE BY THE <br /> EXISTING CEMENT CITY ENGINEER. <br /> CONCRETE --, 2. ALL TEMPORARY PATCHES ON TRENCHES SHALL BE <br /> 6"MIN 4. ,,.-. <br /> F- ' <br /> . '..:./— SAWCUT OR LINE DRILL UNDERLYING CONCRETE PERMANENTLY PATCHED WITHIN 2 WEEKS OF <br /> 6"MIN CEMENT CONCRETE TO COMPLETION OF WORK WITHIN ROADWAY AREA. <br /> MATCH EXISTING THICKNESS <br /> 3. CEMENT CONCRETE FOR PATCHING SHALL BE <br /> 6"MIN CRUSHED SURFACING TOP COURSE COMMERCIAL MIX AS CALLED OUT IN WSDOT <br /> STANDARD SPECIFICATIONS. <br /> SEE STANDARD DRAWING 614 <br /> EXISTING ASPHALT CONCRETE OVER CEMENT CONCRETE <br /> FINAL JOINT MUST <br /> BE SAWCUT <br /> ASPHALT CONCRETE(3"MIN) <br /> EXISTING ASPHALT REPLACEMENT PATCH TO BE <br /> CONCRETE1"THICKER THAN PREVIOUSLY EXISTED <br /> 1_6"MIN "1 / TOP COURSE 6"MIN CRUSHED <br /> OU SEHED SURFACING <br /> - SEE STANDARD DRAWING 614 <br /> EXISTING ASPHALT CONCRETE OVER PREPARED GRADE <br /> X <br /> i FINAL JOINT MUST <br /> BE SAWCUT CEMENT CONCRETE(8"MIN) <br /> i EXISTING CEMENT <br /> CONCRETE REPLACEMENT PATCH TO BE <br /> 1"THICKER THAN PREVIOUSLY EXISTED <br /> PAVEMENT <br /> . . <br /> 5 16"MIN %/ 6". MIN CRUSHED SURFACING CITY OF EVERETT <br /> I_ <br /> TOP COURSE -1'9 ETT PUBLIC WORKS DEPARTMENT <br /> a — SEE STANDARD DRAWING 614 '"df SAss I trelta 1II I""lie (4 6 2017 <br /> BE mu STAMMMN=a, <br /> g EXISTING CEMENT CONCRETE OVER PREPARED GRADE PAVEMENT PATCHING DETAILS 326 <br /> Esq <br /> I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.