My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MN OM r - OM r M E i - r N r I M r M - MN <br /> J <br /> W4-2R W9-3R W20-1 <br /> ROAD <br /> WITH LANERIGHT WORK <br /> CLOSED AHEAD <br /> ROLL SPACING TRUCK AHEAD <br /> (MIN 50'MAX100') WITH <br /> FLASHING BUFFER SPACE TAPER LENGTH SEE SEE SEE <br /> BEACON (SEE TABLE A) (SEE TABLE A) NOTE 1 NOTE 1 _ NOTE 1 <br /> WORK AREA r 1 <br /> --.-. -0- 0-4-®-®-+ 4.---0-4-47 <br /> NOTES LEGEND <br /> 1. DISTANCE BETWEEN SIGNS SHALL BE 100'FOR CONE OR CHANNELIZING DEVICE SEE STANDARD <br /> RESIDENTIAL STREETS(25 MPH)AND 350'FOR DRAWING 713. <br /> ARTERIAL ROADWAYS <br /> U <br /> 3 <br /> 2. FLASHING BEACON INSTALLED AT EACH SIGN FOR <br /> NIGHT-TIME USE(OPTIONAL). <br /> $ 3. DISTANCES MAY VARY AS APPROVED BY THE <br /> ENGINEER. <br /> TABLE A 4. SPOTTERS REQUIRED WHENEVER THE CONTRACTOR <br /> 1 SPEED TAPER LENGTH CONE SPACING BUFFER MUST INTERRUPT TRAFFIC FLOW TO ACCESS THE <br /> (MPH) FOR SHIFT WIDTH (FT) SPACING WORK SITE WITH MATERIALS OR EQUIPMENT <br /> P. 10' 12' TANGENT TAPER (FT) (FLAGGING REQUIRES 3 OR 4 SIGN SETUP). <br /> 'i 25 105' 125' 25 55 5. SIGN SIZE PER MUTCD. CITY OF EVERETT <br /> 30 150' 180' 30 85 6. THIS PLAN IS PROVIDED ASA GUIDE ONLY.FOR '� <br /> 35 205' 245' 35 20 120 SPECIFIC INFORMATION ON TRAFFIC CONTROL PLANSal PUBLIC WORKS DEPARTMENT <br /> 40 270' 320' 90 170 SEE CURRENT MUTCD. "' SASS I Co((E!i I enui4mt w.. I''''ISH 12/30/2016 <br /> 45 420' 540' 45 220 �` TRAFFIC CONTROL PLAN """""""~""' <br /> 1- WITH RIGHT LANE CLOSED 5 LANE ROADWAY <br /> 704 <br /> I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.