My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 6-02.3(7) Vacant <br /> 2 This section, including title, is revised to read: <br /> 3 <br /> 4 6-02.3(7) Tolerances <br /> 5 Unless noted otherwise, concrete construction tolerances shall be in accordance with this <br /> 6 section. Tolerances in this section do not apply to cement concrete pavement. <br /> 7 <br /> 8 Horizontal deviation of roadway crown points, cross-slope break points, and curb, barrier <br /> 9 or railing edges from alignment or work line: ±1.0 inch <br /> 10 <br /> 11 Deviation from plane: ±0.5 inch in 10 feet <br /> 12 <br /> 13 Deviation from plane for roadway surfaces: ±0.25 inch in 10 feet <br /> 14 <br /> 15 Deviation from plumb or specified batter: ±0.5 inch in 10 feet, but not to exceed a total of <br /> 16 ±1.5 inches <br /> 17 <br /> 18 Vertical deviation from profile grade for roadway surfaces: ±1 inch <br /> 19 <br /> 20 Vertical deviation of top surfaces (except roadway surfaces): ±0.75 inch <br /> 21 <br /> 22 Thickness of bridge decks and other structural slabs not at grade: ±0.25 inch <br /> 23 <br /> 24 Length, width and thickness of elements such as columns, beams, crossbeams, <br /> 25 diaphragms, corbels, piers, abutments and walls, including dimensions to construction <br /> 26 joints in initial placements: +0.5 inch, -0.25 inch <br /> 27 <br /> 28 Length, width and thickness of spread footing foundations: +2 inches, -0.5 inch <br /> 29 <br /> 30 Horizontal location of the as-placed edge of spread footing foundations: The greater of <br /> 31 ±2% of the horizontal dimension of the foundation perpendicular to the edge and ±0.5 <br /> 32 inch. However, the tolerance shall not exceed ±2 inches. <br /> 33 <br /> 34 Location of opening, insert or embedded item at concrete surface: ±0.5 inch <br /> 35 <br /> 36 Cross-sectional dimensions of opening: ±0.5 inch <br /> 37 <br /> 38 Bridge deck, bridge approach slab, and bridge traffic barrier expansion joint gaps with a <br /> 39 specified temperature range, measured at a stable temperature: ±0.25 inch <br /> 40 <br /> 41 Horizontal deviation of centerline of bearing pad, oak block or other bearing assembly: <br /> 42 ±0.125 inch <br /> 43 <br /> 44 Horizontal deviation of centerline of supported element from centerline of bearing pad, <br /> 45 oak block or other bearing assembly ±0.25 inch <br /> 46 <br /> 47 Vertical deviation of top of bearing pad, oak block or other bearing assembly: ±0.125 inch <br /> 48 <br /> 1 <br /> 49 6-02.3(10)C Finishing Equipment <br /> 50 The first paragraph is revised to read: <br />
The URL can be used to link to this page
Your browser does not support the video tag.