My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 2. Obtain the Engineer's permission to place concrete after the Engineer has <br /> 2 inspected the placement of the reinforcing steel. (Any concrete placed without <br /> ' 3 the Engineer's permission shall be rejected and removed.) <br /> 4 <br /> 5 6-02.3(25)H Finishing <br /> 6 The last paragraph is revised to read: <br /> 7 <br /> 8 The Contractor may repair defects in prestressed concrete girders in accordance with <br /> ' 9 Section 6-01.16. <br /> 10 <br /> 11 6-02.3(27) Concrete for Precast Units <br /> 12 The last sentence of the first paragraph is revised to read: <br /> 13 <br /> 14 Type III portland cement or blended hydraulic cement is permitted to be used in precast <br /> 15 concrete units. <br /> ' 16 <br /> 17 6-02.3(28)B Casting <br /> 18 In the second paragraph, the reference to Section 6-02.3(25)B is revised to read Section 6- <br /> 19 02.3(25)C. <br /> 20 <br /> 21 6-02.3(28)D Contractors Control Strength <br /> 22 In the first paragraph, "WSDOT FOP for AASHTO T 23" is revised to read "FOP for AASHTO <br /> 23 T 23". <br /> 24 <br /> ' 25 6-02.3(28)E Finishing <br /> 26 This section is supplemented with the following: <br /> 27 <br /> 28 The Contractor may repair defects in precast panels in accordance with Section 6-01.16. <br /> 29 <br /> 30 6-05.AP6 <br /> 31 Section 6-05, Piling <br /> 32 January 2, 2018 <br /> 33 6-05.3(9)A Pile Driving Equipment Approval <br /> 34 The fourth sentence of the second paragraph is revised to read: <br /> 35 <br /> 36 For prestressed concrete piles, the allowable driving stress in kips per square inch shall <br /> 37 be 0.095 • ./f', plus prestress in tension, and 0.85f'c minus prestress in compression, <br /> 38 where f'c is the concrete compressive strength in kips per square inch. <br /> 39 <br /> 40 6-07.AP6 <br /> 41 Section 6-07, Painting <br /> 42 January 2, 2018 <br /> ' 43 6-07.3(6)A Paint Containers <br /> 44 In item number 2 of the first paragraph, "Federal Standard 595" is revised to read "SAE AMS <br /> ' 45 Standard 595". <br /> 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.