My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1 <br /> 2 When AASHTO T 301 is used, a minimum of 65% elastic recovery (ER) will be required <br /> 3 when tested at 25°C ± 0.5°C. <br /> 4 <br /> 5 9-02.1(6) Cationic Emulsified Asphalt <br /> 6 This section is revised to read: <br /> 7 <br /> 8 Cationic Emulsified Asphalt meeting the requirements of AASHTO M 208 Table 1 of the <br /> 9 grades specified in the Contract shall be used. <br /> 10 <br /> 11 9-02.5 Warm Mix Asphalt (WMA) Additive <br /> 12 This section, including title, is revised to read: <br /> 13 1 <br /> 14 9-02.5 HMA Additive <br /> 15 Additives for HMA shall be accepted by the Engineer. <br /> 16 1 17 9-03.AP9 <br /> 18 Section 9-03, Aggregates <br /> 19 August 6, 2018 I <br /> 20 9-03.1 Aggregates for Portland Cement Concrete <br /> 21 This section's title is revised to read: <br /> 22 <br /> 23 Aggregates for Concrete <br /> 24 <br /> 25 9-03.1(1) General Requirements <br /> 26 The first two sentences of the first paragraph are revised to read: <br /> 27 <br /> 28 Concrete aggregates shall be manufactured from ledge rock, talus, or sand and gravel in <br /> 29 accordance with the provisions of Section 3-01. Reclaimed aggregate may be used if it <br /> 30 complies with the specifications for concrete. <br /> 31 <br /> 32 The second paragraph (up until the colon) is revised to read: <br /> 33 <br /> 34 Aggregates for concrete shall meet the following test requirements: <br /> 35 <br /> 36 The second sentence of the second to last paragraph is revised to read: <br /> 37 <br /> 38 The Contractor shall submit test results according to ASTM C1567 through the Engineer <br /> 39 to the State Materials Laboratory that demonstrate that the proposed fly ash when used <br /> 40 with the proposed aggregates and cement will control the potential expansion to 0.20 <br /> 41 percent or less before the fly ash and aggregate sources may be used in concrete. <br /> 42 <br /> 43 9-03.1(2) Fine Aggregate for Portland Cement Concrete <br /> 44 This section's title is revised to read: <br /> 45 <br /> 46 Fine Aggregate for Concrete <br /> 47 <br /> 48 9-03.1(4) Coarse Aggregate for Portland Cement Concrete <br /> 49 This section's title is revised to read: <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.