My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1 <br /> 2 • Bond strength of 250 psi or higher at 28 days or less in accordance with ASTM <br /> 3 C 1583 or ICRI 210.3R <br /> 4 <br /> 5 • Shrinkage shall be 0.05 percent (500 microstrain) or lower at 28 days in <br /> 6 accordance with AASHTO T 160 (ASTM C 157) as modified by ICRI 320.3R <br /> 7 <br /> 8 • Permeability shall be 2,000 coulombs or lower at 28 days in accordance with <br /> 9 AASHTO T 277 (ASTM C 1202) <br /> 10 <br /> 11 • Freeze-thaw resistance shall have a durability factor of 90 percent or higher <br /> 12 after a minimum of 300 cycles in accordance with AASHTO T 161 Procedure A <br /> 13 (ASTM C 666) <br /> 14 <br /> 15 • Soluble chloride ion limits in Section 6-02.3(2) shall be satisfied <br /> 16 <br /> 17 9-20.2(1) Patching Mortar <br /> 18 This section, including title, is deleted in its entirety. <br /> 19 <br /> 20 9-20.2(2) Patching Mortar Extended with Aggregate <br /> 21 This section, including title, is deleted in its entirety. <br /> 22 <br /> 23 9-20.5 Bridge Deck Repair Material <br /> 24 Item number 3 of the first paragraph is revised to read: <br /> 25 <br /> 26 3. Permeability of less than 2,000 coulombs at 28-days or more in accordance with <br /> 27 AASHTO T 277. <br /> 28 <br /> 29 9-21.AP9 <br /> 30 Section 9-21, Raised Pavement Markers (RPM) <br /> 31 January 2, 2018 <br /> 32 9-21.2 Raised Pavement Markers Type 2 <br /> 33 This section's content is deleted. <br /> 34 <br /> 35 9-21.2(1) Physical Properties <br /> 36 This section, including title, is revised to read: <br /> 37 <br /> 38 9-21.2(1) Standard Raised Pavement Markers Type 2 <br /> 39 The marker housing shall contain reflective faces as shown in the Plans to reflect incident <br /> 40 light from either a single or opposite directions and meet the requirements of ASTM D <br /> 41 4280 including Flexural strength requirements. <br /> 42 <br /> 43 9-21.2(2) Optical Requirements <br /> 44 This section, including title, is revised to read: <br /> 45 <br /> 46 9-21.2(2) Abrasion Resistant Raised Markers Type 2 <br /> 47 Abrasion Resistant Raised Markers Type 2 shall comply with Section 9-21.2(1) and meet <br /> 48 the requirements of ASTM D 4280 with the following additional requirement: The <br /> 49 coefficient of luminous intensity of the markers shall be measured after subjecting the <br />
The URL can be used to link to this page
Your browser does not support the video tag.