My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/1411b4/111 <br /> PUBLIC WORKS <br /> I 4d1JRETT <br /> ' CITY OF EVERETT, WASHINGTON <br /> ' ADDENDUM NO.3 <br /> N. BROADWAY TRANIST IMPROVEMENT PROJECT <br /> STATE FUND# GCB2316; COE WO# 3644 <br /> 1 August 24th 2018 <br /> Notice to Plan holders: <br /> This Addendum No. 3 contains the following revisions, additions, deletions, and/or clarifications, <br /> ' is hereby made a part of the plans and specifications (Contract Documents) for the above <br /> named project, and shall be taken into consideration by Bidders in submitting their bids. <br /> t Bidders shall acknowledge receipt of this Addendum No. 3 in the space provided on the <br /> Proposal. Failure to do so may subject the Bidder to disqualification of its bid. <br /> SPECIAL PROVISIONS <br /> 1) Delete Section 1-07.9(3) Apprentice Utilization Requirement: delete line 15-50 on page 27, <br /> delete entire page 28, delete line 1-43 on page 29 (no attachment). <br /> ' All other requirements of the plans and specifications remain in effect. <br /> This addendum shall be attached to and made a part of the plans and specifications and shall <br /> be acknowledged on the bidder's proposal. <br /> Sincerely, <br /> Grace Kane, P,E. <br /> Project Engineer <br /> 1 <br /> COE WO# 3644: Addendum No. 3 — Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.