My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I 1 2L7I E.ta ",= '._ <br /> 2 Division 1 <br /> 3 General Requirements <br /> 5 05.574;7017:if,017.1 <br /> 6 DESCRIPTION OF WORK <br /> I 7 <br /> 8 FDESWOR/f? DOCX <br /> 9 (March 13, 1995) <br /> 10 This Contract provides for the improvement of*** installing ADA accessible bus stop curb <br /> 11 bulb-out along North Broadway corridor between 34t'' Street to Tower St. All locations, <br /> 12 except two, will have bus shelter, and other transit amenities. *** and other work, all in <br /> I 13 accordance with the attached Contract Plans, these Contract Provisions, and the Standard <br /> 14 Specifications. <br /> 15 <br /> 16 77 <br /> I17 1-01.3 Definitions <br /> 18 (January 4, 2016 APWA GSP) <br /> 19 <br /> I 20 Delete the heading Completion Dates and the three paragraphs that follow it, and replace <br /> 21 them with the following: <br /> 22 <br /> I23 Dates <br /> 24 Bid Opening Date <br /> 25 The date on which the Contracting Agency publicly opens and reads the Bids. <br /> 26 Award Date <br /> 27 The date of the formal decision of the Contracting Agency to accept the lowest <br /> 28 responsible and responsive Bidder for the Work. <br /> I29 Contract Execution Date <br /> 30 The date the Contracting Agency officially binds the Agency to the Contract. <br /> I 31 Notice to Proceed Date <br /> 32 The date stated in the Notice to Proceed on which the Contract time begins. <br /> 33 Substantial Completion Date <br /> I <br /> 34 <br /> 35 The day the Engineer determines the Contracting Agency has full and unrestricted <br /> use and benefit of the facilities, both from the operational and safety standpoint, any <br /> 36 remaining traffic disruptions will be rare and brief, and only minor incidental work, <br /> I 37 replacement of temporary substitute facilities, plant establishment periods, or <br /> 38 correction or repair remains for the Physical Completion of the total Contract. <br /> 39 Physical Completion Date <br /> I <br /> 40 <br /> 41 The day all of the Work is physically completed on the project. All documentation <br /> required by the Contract and required by law does not necessarily need to be <br /> 42 furnished by the Contractor by this date. <br /> I 43 Completion Date <br /> 44 The day all the Work specified in the Contract is completed and all the obligations of <br /> 45 the Contractor under the contract are fulfilled by the Contractor. All documentation <br /> I 46 required by the Contract and required by law must be furnished by the Contractor <br /> 47 before establishment of this date. <br /> I <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> I <br /> STATE FUND#GCB2316; COE WO#3644 1 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.