My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 2 1-02.10 Withdrawing, Revising, or Supplementing Proposal <br /> 3 (July 23, 2015 APWA GSP) <br /> I 4 <br /> 5 Delete this section, and replace it with the following: <br /> 6 <br /> 7 After submitting a physical Bid Proposal to the Contracting Agency, the Bidder may <br /> 8 withdraw, revise, or supplement it if: <br /> 9 <br /> I 10 <br /> 11 1. The Bidder submits a written request signed by an authorized person and <br /> physically delivers it to the place designated for receipt of Bid Proposals, and <br /> 12 2. The Contracting Agency receives the request before the time set for receipt of <br /> 13 Bid Proposals, and <br /> 14 3. The revised or supplemented Bid Proposal (if any) is received by the <br /> 15 Contracting Agency before the time set for receipt of Bid Proposals. <br /> I 16 <br /> 17 If the Bidder's request to withdraw, revise, or supplement its Bid Proposal is received <br /> 18 before the time set for receipt of Bid Proposals, the Contracting Agency will return the <br /> 19 unopened Proposal package to the Bidder. The Bidder must then submit the revised or <br /> 20 supplemented package in its entirety. If the Bidder does not submit a revised or <br /> 21 supplemented package, then its bid shall be considered withdrawn. <br /> 22 <br /> I <br /> 23 Late revised or supplemented Bid Proposals or late withdrawal requests will be date <br /> 24 recorded by the Contracting Agency and returned unopened. Mailed, emailed, or faxed <br /> 25 requests to withdraw, revise, or supplement a Bid Proposal are not acceptable. <br /> I 26 <br /> 27 <br /> 28 Public Opening of Proposals <br /> I 29 <br /> 30 '-C2.22o7'.1Sr L.GR1 <br /> 31 Section 1-02.12 is supplemented with the following: <br /> I 32 s <br /> 33 CCE ;- 2,12,0PTi-GPENI Got 41E,docx <br /> 34 1-02.12 PUBLIC OPENING OF PROPOSALS <br /> 1 35 Section 1-02.12 is supplemented with the following: <br /> 36 <br /> I 37 (******) <br /> 38 <br /> 39 The bid opening date for this project is $$ September 4th, 2018 $$. Bids received will be <br /> I 40 publicly opened and read after 2:00pm on this date. <br /> 41 <br /> 42 Bids will be opened at: <br /> I 43 <br /> 44 City of Everett <br /> 45 Wall Street Building <br /> I 46 8th Floor Hearing Room <br /> 47 2930 Wetmore Ave, <br /> 48 Everett, WA 98201 <br /> 1 <br /> 49 <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> ISTATE FUND#GCB2316; COE WO#3644 7 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.