My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith 11/2/2018 Amendment 3
>
Contracts
>
6 Years Then Destroy
>
2018
>
Murraysmith 11/2/2018 Amendment 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2018 10:21:37 AM
Creation date
11/8/2018 10:21:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith
Approval Date
11/2/2018
Council Approval Date
10/24/2018
End Date
12/31/2018
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Legion GC Ponds and Alverson Storm
Public Works WO Number
UP3620 2
Amendment/Change Order
Amendment
Amendment/Change Order Number
3
Total Compensation
$22,175.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Legion Golf Course Stormwater Detention Project <br /> City of Everett Work Order#UP3620 <br /> Scope of Work <br /> Exhibit C-3—Additional Engineering Services <br /> Murraysmith, formerly Murray, Smith& Associates, Inc., has developed the following scope of <br /> work and fee estimate for additional engineering services for the Legion Golf Course Stormwater <br /> Detention Project, City of Everett Project#UP3620-2. The scope and fee have been developed <br /> based on requested additional engineering to support the project through the construction phase <br /> and provide modeling support for the next phase of the stormwater separation project, the <br /> Alverson Boulevard Stormwater Separation project. <br /> Task Description <br /> Task 13—Construction Management Support <br /> This task represents limited involvement of the Murraysmith team during the construction of the <br /> improvements to support the City's project manager and construction management group. <br /> Murraysmith's involvement will be limited to support and periodic collaboration with the City, <br /> the construction contractor, permitting agencies and others, all at the direction of the City up to <br /> the extent of the budget for this task. Elements of this task include: <br /> • Meetings—Attend project progress meetings with City and contractor, as requested. <br /> • Site Visits—Conduct site visits to support the City's on-site inspector and observe work <br /> in the golf course at key project milestones, this includes three additional site visits by <br /> iCon Golf. <br /> • Clarifications and Changes—Murraysmith will assist with issuing clarifications to the <br /> construction contractor and responding to design changes, change orders, as requested. <br /> Prepare review comments and submit to City electronically. <br /> • Walk Through and Punch List—Assist the City in a final walk through and developing a <br /> punch list for the construction contractor. <br /> Assumptions: <br /> 1. City will take the lead in administrating and managing the construction contract <br /> and communicating with the construction contractor. <br /> 2. Murraysmith and team members will provide services as requested by the City <br /> through project completion up to the extent of the budget established for this <br /> phase of the work. <br /> City of Everett Murraysmith Legion Golf Stormwater <br /> October 2018 Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.