My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST GROUP HEALTH 2018-01-01 MF Import
>
Address Records
>
MAPLE ST
>
2930
>
GROUP HEALTH
>
2930 MAPLE ST GROUP HEALTH 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2018 3:36:20 PM
Creation date
11/13/2018 2:52:51 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
GROUP HEALTH
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
703
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��� <br /> PUBLIC WORKS DEPARTMENT <br /> COST EBTIMATE BHEBT UTILITIES DIVISION <br /> 2300 CEDAR STREET <br /> EVERETT, WASHINGTON 98201 <br /> (206) 259-8800 <br /> Receipt ,� Uate Paid <br /> _ Cost of Work Order $ Work order � <br /> �_ Cost of Service Order $ 12 .773 Service Order #' <br /> Contact Person: Kirk Brooks TeleFhone ,� 259-1572 <br /> Requested By: GenQ Wriaht Date of Request 12/10/92 <br /> Property Owner (name) W & H Pacific <br /> I ' . Charqe Cost to (name if different than owner) Grouo Health Co-Oo <br /> Address _2731 Wetmore City Everett Zip 98201 <br /> Installation Location 2928 Manle Everett <br /> Installation type/description/size/etc. Excavate 6�� cast iron main ta�, <br />� I� � . <br /> 4" and �nstall 3'� domestic mete� restore area. (��Alternative A'�L <br /> II [X� The following estimate is based upon the Utilities Division <br />� providing all labor, equipment, materials, restoration, and final <br />� •_�;�i I hookwp. <br />� w ; <br />' ,��;' [ j The following eatimate is based upon the Street Division work group <br /> providing all labor, equipment, materials and restoration to <br /> , , , property. <br /> p � Whenever the eetimated cost ie not eufficient to cover the total expenee for labor, <br /> , - ; mdterial, equipment rental end ndminietrative coets, the deficit ehall be charged to <br /> the property for which euch inetallation wae made and the owner thereof, and provided <br /> , further, that any exceen pnyment ahall be returned to the person ap 1 in for the <br /> ine <br /> tallation. <br /> P Y 9 <br /> � i <br /> xt.mis•a Cost Estimat�: <br /> Labor & Overhead 5. 120. 00 cc: a1dg. Permit counter <br /> Clair Olivere <br /> Material 5.991. 00 Tom Thetford <br /> Don Weitkamp <br /> Equipment Rental 1. 462.00 tcirk arooke <br /> cordon Witcher <br /> Surface Restoration 200. 00 0. oon wahl <br /> Dan Lowell <br /> Tot�l 12 773 . 00 stan Mitchell <br />' � �Z-- �� <br /> I Prepared by . „� 5�557F.-.- ToTAI ESTImAT{ <br /> fpK TiJO VAu�T RGuTrnrE, <br /> Accepted b Representing _ <br /> P:�viseE OB/I6/91 <br /> JG786CST <br />
The URL can be used to link to this page
Your browser does not support the video tag.