Laserfiche WebLink
--�, . . <br /> ' Response to city comment�: osia�sa <br /> Item# Action Dwawing M or ���� Addendum N Sketch N <br /> S ificaton N <br /> 13 Hendrafls shall meet Section A� � g�/A1.1 A.AD2/ITEM 26 SK-1/A.AD2 <br /> 3306 i <br /> 14 Handgrips shetl meet Section A9 6 A4/A9.6,A5/A9.6, <br /> � i CMA9.F <br /> 15 Stair#3 is extended to rooi A9 4 � A.AD2/ITEM 11g SK-81/A.AD2 thru <br /> level SK-83/A.AD2 <br /> 16 See item 13 above � <br /> �� Ouardrails wili conform to A3.3, A9.5& I E1/A3.3, E4lA102 A.AD2/ITEMS 62 SK-27/A.AD2 <br /> section 1712(a) A10.2 8 E2/A9.5 & 122 <br /> Ip� �� � �2 �SK-23/A.AD2, SK- <br /> � 18 Sta(rways#1 #2 have hetch to Aa.1,A92 and A.AD2/ITEMS 56, 2MA.AD2&SK- <br /> open to roof. A9 3 57, 115,116& 117 77/q.AD2 thru SK- <br /> 80/A.AD2 <br /> 19 Stair M3 has been extended to A9.4 A.AD2/ITEM 118 SK-Bt/A.AD2 thru <br /> the roof SK-83/A.AD2 <br /> 20 Signage hes been edjusted A11.1 &A11.3 10/A11.1 A.AD2/ITEM 124.2 SK-89/A.AD2 <br /> See attached information from ` <br /> ICBO, Northwest Testing Lebs <br /> 21 and Washington Hardwood <br /> Company regarcling 3/4 HR <br /> r uirements. 8 sheets I <br /> 21a IDeletedS109BR A2JA A.AD2/ITEM37 SK-7/A.AD2 <br /> 21b Deleted S740AR&S140BR A2.7A A.AD2/ITEM 36 <br /> 21c See item 21 above �� <br /> 2�d See ftem 21 above and change A6.18 � <br /> lass to wire lass I <br /> 21e See item 21 above I I <br /> 21f Detail is part of casework �'8A''�'9A�` A3/A102 <br /> A102 <br /> � Deteil will not be used at rated � C3/A10.1 <br /> walls. See item 8 above <br /> Guardrails are adjusted to —' <br /> 23 A7.1 E1/A1.1 A.AD2/ITEM 26 SK-2/A.AD2 <br /> meet Sectfon 1712 a�_____ � <br /> � Elevetor lobbles provided at � ����� I��SK-3/A.AD2, SK- <br /> 24 levels P7,C7 &C2 per section A2.1A, A2.7A and A.AD2/ITEMS 29, 7/A.AD2 and SK- <br /> 3305Q)and discussion with A2.9A 37 8 47 17/A.AD2 keynote <br /> buildin official. �p, <br /> 25 Provided S2�3 A.AD1/ITEM 22 SK-11/S.AD1 <br /> SK-3/A.AD2, SK- <br /> 9JA.AD2, SK- <br /> A.AD2/ITEMS30, �0/A.AD2, RK- <br /> 26 Doors/Dfinentfons have been A2.18, A2.7B, 39,45, 48 ,49& ��A.AD2, SK- <br /> adjusted. A2.8B and A2.98 52 15/A.AD2,SK- <br /> 17/A.AD2 (keynote <br /> 15 8 18), 8 SK- <br /> 20/A.AD2 <br /> CITYRPLY.XLS Page 2 <br />