Laserfiche WebLink
INSPECTION REPORT <br />.... __.� ,, .. <br />. . f�:.I,,, <br />, � <br />. - _i� 2 _i <br />.. - • �. <br />TYPE OF INSPECTION REQUESTED <br />❑ BLDG: Pmt. No. ❑ MECH: Pmt. No.� <br />❑ ELEC: Pmt. Na. _ �1 PLBG: Pirt. No. �-�_ C 7' <br />❑ Temp. Elect. ❑ Framing O Gas Piping <br />❑ Footing ❑ Dry�vall, Nailing ❑ Consultation <br />❑ Foundation ❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork ❑ Grid �.Siruct. Slab <br />❑ Wood Stove ❑ Rough-In � F'nal <br />❑ �°^^^' � ❑ Service p`— _ <br />�,vrrHUVA � ❑ PARTIAL APPROVAL <br />N ❑ CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Piease contact inspector and arrange for appointment. <br />❑ Was nol able to perform inspection. <br />❑ CALL 259-8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspecto / � � <br />Date <br />