My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2716 MCDOUGALL AVE ERICKSON FURNITURE 2018-01-02 MF Import
>
Address Records
>
MCDOUGALL AVE
>
2716
>
ERICKSON FURNITURE
>
2716 MCDOUGALL AVE ERICKSON FURNITURE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 2:26:45 PM
Creation date
11/14/2018 8:23:53 AM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
2716
Tenant Name
ERICKSON FURNITURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page <br />7/28/2015 15:10 <br />Issued By CSG CAVANAH, SHANE G. <br />Issued Department Pw PUBLIC WORKS <br />Date Issued 5/8/2015 <br />Fund 401 Accounts Program 710 Function 119 Activity 675 <br />Program <br />Title REPAIR 751NCH 2716 MCDOUGALL AVE 710119675 <br />Work Order No 20151116 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br />Status 5/8/2015 Time o6D1 Original WO Billing <br />Problem Details <br />LEAKY VALVE ON SETTER. <br />Structure ID <br />WS2095VO76 <br />Address 2716 <br />Cross Street <br />Area Designator <br />Map Reference <br />Location <br />Work Activity Work Order <br />a!Ejyj2 Activity <br />WASRVC <br />MCDOUGALL AVE <br />Type Vehicle No Description <br />V JC039 1999 FORD 1 112 TON SVC TRUCK <br />V JC349 2000 FORD 1 1/2 TON SERVICE TR <br />Compl Date Comments <br />YES 612/2015 <br />Structure Location <br />Vehicle Costs <br />Hours Cost Billing Date Billing Cade Warehouse <br />2 19.6 05107/2015 <br />2 19.8 05/07/2015 <br />Total Vehicle Cost $39 40 <br />Material Costs <br />Billing— <br />Type <br />Mater No _ <br />Description <br />Quantity Cost Date <br />War <br />M <br />BOX000154347 <br />BOX METER MOLDED PLASTIC VJIDI LID 11" X 18" (SMALL) <br />1 71 277 05/07/2015 <br />PAP <br />M <br />COUP34101847 <br />COUPLING 314 NPT BRASS <br />1 2.889 05/0712015 <br />PAP <br />M <br />SETT34146547 <br />SETTER COPPER 5/8 X VAI (HEIGHT 9-) NO LEG LENGTH HIIHO <br />1 114,558 0510712015 <br />PAP <br />Total Material Cost <br />$188.73 <br />Personnel Costs <br />Type <br />ID <br />Name Hours Cost Billing Date <br />Earning Code Class <br />P <br />FBL <br />FISHER, BOBBY L. 2 53.344 05/07/2015 <br />P <br />HSG <br />HOLLO, SAMUAL 2 43.816 05/0712015 <br />P <br />JDF <br />JERRETT, DANIEL F. 2 41.782 05(07/2015 <br />Total Personnel Cost $138.94 <br />Total Cost $367.07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.