Laserfiche WebLink
TQ POSTING '"Y 13 'sse <br />c�.osso cK aox�c oxn�s xsroirr <br />Total IItility Maintenance Manaqement Systom <br />10/03/1996 Page 1 <br />Date Ranqe :O1/09!1989 - 09/26/1996 <br />CM Work Order Range :1001091070001 - UT2600-02- Pattern :7101196648944 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ?,LL Activity l�I.L <br />Cli WORK ORDER ID: 7101196648944 Titlec SO 6 It�'CH 312U MCDOUG?.LL ]�VE <br />«DUPLICd,TE PRINTING OF THIS WORK ORDER» <br />Item ID: -- <br />Location ID: -- <br />Proqram 710 Function 119 <br />Date Completed: 09/03/1996 <br />Overall Craft: <br />Issued: 06/26/1996 <br />Out of Service? NO <br />lieter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name <br />----- -^---- ---- <br />Issued by: <br />Priority: <br />WST BBA BRP,DLEY, BROCK A. <br />UL CSG CAVANt,H, SHANE G. <br />SUP2 GJ GARZA, JOHN (NMI) <br />USW RCR ROSE, CECIL R. <br />DL SWJ SMITH, WILLI?,M J. <br />![aterials: <br />ID <br />BOX000043347 <br />BOX000065547 <br />COUP38007347 <br />ELL038107947 <br />INSE38021047 <br />METE34141847 <br />METE38137747 <br />N/A <br />NIPP38133847 <br />PIPE38060947 <br />SADD44017247 <br />SETT38033447 <br />VALV38034348 <br />vehicles: <br />ID <br />V0017 <br />Description <br />ACtiVity 664 <br />Assigned to: <br />Travel Time: 0.00 Hr. <br />Planned Hrs l,ctual Hz ; Cost <br />----------- ---------- ---------- <br />0.00 2.00 34.48 <br />0.00 2.00 24.24 <br />0.00 1.00 24.46 <br />0.00 1.00 19.49 <br />0.00 2.00 19.00 <br />BOX VALVE 18°TOP 24"BOTTOM CI <br />BOX IiETER CONC W/STEEL LID <br />COUPLING COMP 2° MIP X CTS @ <br />ELL 2" 90 DEG STREET BRASS ^ <br />INSERT STIFFENERS 2" CTS @ <br />HETER 5/8" X 3/4° NEPTUNE <br />METER 2" NCPTUNE W/PRO RF1►D <br />BLFI�CH (FROIi STOCK) <br />NIPPLE 2" X CLOSE BRASS ^ <br />PIPE 2" POLY C.T.S. <br />SERVICE S?.DDLE 6" W/2" IP DBL <br />SETTER CUST 2" LENGTH 12"X 17^ <br />VALVE GATE 2" SUPER HEIIVY DUTY <br />Description <br />-------------------- <br />94 FORD AEROSTAR VAN <br />Total Labor Cost: 121.67 <br />Date f Used Cost <br />-------- -------- ---------- <br />07/02/1996 1 28.50 <br />07/02/1996 1 35.02 <br />07/02/1996 2 36.00 <br />07/02/1996 1 9•87 <br />07/02/1996 2 2.12 <br />09/03/1996 1 87.53 <br />07/02/1996 1 429.32 <br />07/02/199 .32 <br />07/02/1996 1 3•2� <br />07/02/1996 42 43.68 <br />07/02/1996 1 20.92 <br />07/02/1996 1 277.94 <br />07/02/1996 1 91.52 <br />Total Material Cost: <br />Hours <br />1.00 <br />�ost <br />6.00 <br />