Laserfiche WebLink
CI.OSED GRi WORR ORDERS REPORT pj ; � I ��%� <br />Total Utility Maintenance Management System <br />11/12/1996 Paae 1 <br />------------------- -------------- <br />Date Range :O1/09/1989 - 11/05/1996 <br />CM Work Order Range :1001091070001 - UT2600-02- Pattern :7101196750884 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Proqram ALL Function ALL Activity ALL <br />___-___-___�---------------- -- <br />--------------------- -- <br />CM WORK ORDER ID: 7101196750884 Title: REPAIR 3120 MCDOUGALL 1�VE � <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS2995F001 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 10/21/1996 <br />Overall Craft: <br />Issued: 10/15/1996 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL CSG <br />WST WDT <br />Materials: <br />ID <br />ADAP360011A7 <br />ADAP36001247 <br />ELL036194047 <br />PIPE36060747 <br />SETT36033547 <br />Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />CAVANAH, SHANE G. <br />WALDEN, DAROLD T. <br />Description <br />--------------------------- <br />ADAPTER 1" IPS UNION INSTA @ <br />ADAPTER 1" MIP X INST�,-TITE @ <br />ELL 1" 90 DEG STREET HRASS ^ <br />PIPE 1" POLY I.P.S. <br />SETTER COP 1" (H15") <br />Planned Hrs <br />0.00 <br />0.00 <br />Actual Hrs <br />�} . 00 <br />4.00 <br />Total Labor Cost: <br />Date <br />10/21/1996 <br />10/21/1996 <br />10/21/1996 <br />10/21/1996 <br />10/21/1996 <br />#' Used <br />1 <br />1 <br />1 <br />16 <br />1 <br />Total Mate-•ial Cost: <br />vehicles: <br />ID Description Hours Cost <br />------------ ------------------------------ ------ ---------- <br />V2117 91 CHEV 1-TON HYD UNIT 9.00 22.40 <br />VH0003 94 CAT BACKHOE 4.00 111.60 <br />Work Description: <br />----------------------- <br />MOVE METER BACK APPROX <br />BILL/REFUND TO : HILL <br />Total Vehicle Cost: 13A.00 <br />---------------------------------------- <br />5� AND INSTALL NEW CONCRETE METER BOX. <br />ST. INVESTMENT <br />*NOTE* NEW METER BOX WAS "NOT" NEEDED, DO NOT CHARGE FOR METER BOX. <br />Cost <br />___ 52.28 <br />81.80 <br />134.08 <br />Cost <br />12.22 <br />11.86 <br />2.73 <br />6.24 <br />93.38 <br />126.4 <br />