My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3402 MCDOUGALL AVE SNO CO FLEET OFFICE AND MAINTENANCE 2018-01-01 MF Import
>
Address Records
>
MCDOUGALL AVE
>
3402
>
SNO CO FLEET OFFICE AND MAINTENANCE
>
3402 MCDOUGALL AVE SNO CO FLEET OFFICE AND MAINTENANCE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 10:05:03 AM
Creation date
11/14/2018 11:04:29 AM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
3402
Tenant Name
SNO CO FLEET OFFICE AND MAINTENANCE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�Project Info IP�Qd �°ro� �none.s•n �auncy rt«c winc•�une. ney. �i loa�e j�jp�9e I <br />l�ot MeDou{,'.11 Av�nw <br />ewnet, M.thinpton <br />John �eep�r ' <br />l4i111np Mard Il�pnunon ��r4�hii+ <br />(20i) p97-1Y00 <br />�ject Description I A constant volume heat recovery unit with the control thermostat in the garage will <br />fy des«ibe mecnaniwi sys�em supply heal lo this building. Electric duct heaters are used to add heat to the system for <br />and katures. I space comfort control in areas other then the garage. <br />I � Simple Syslem � Complex System � Systems Malysis <br />n�t10I1 (See Dedsfon Flowdian (over) for qualifiwlions. Use separate MECH•SUM for simple 6 tamplez systems.) <br />Schedules I Tha fdlowtnp Information Is requirod to be Incorporated with the meManiwl equipment schedubs on the <br />pians. For projects without plans, fill in Me required intamation below. <br />Coolin E ui ment Schedule <br />Equlp. Capadty� OSACFM SEER <br />ID B�and Name� Model No.� Btulh Total CFM w Econo7 or EER IPLV� Loration <br />Fan E uipment Schedule <br />Equip. <br />ID Brand Name' Modei No.� CFM gp' HPlBHP Flow Control° Locatlon of Service <br />'ll avallable. = As lesletl accordinp lo Table 14-1, 74-2 or 14•3. � II requlred. � COP, HSPF, Combuslion Effidency, a AFUE, as <br />applicable. <br />s <br />
The URL can be used to link to this page
Your browser does not support the video tag.