Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />4. Connect side sewer per City Standard #601. <br />5. Connect side sewer per City Standard #'s 601, 602, 604. <br />6. Connect all rooftop downspouts to the side sewer. <br />7. Connect rooftop downspouts to the drainage system provided for this lot. <br />8. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br />Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachment for <br />more details. <br />9. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior <br />to beginning the project. <br />10. Install erosion contrul measures as determined by the Public Works inspector, such as silt fence, <br />straw bales, swales, or erosion blankets. /__—`` <br />11. Instail erosion control measures per City�of Everett Standards for smali parcels <br />�, <br />12. Remove erosion control measures upon completion of the project prior to fnal approval of the permit. <br />13.1 <br />16. <br />All excavated materiai From foundalion, sidewalk and driveways shall be hauled to an approved, <br />permitted sile. No wasting of material is allowed on this building lot. <br />No dirt, mud, rocks or debris to be lracked onto roadway. <br />i ---� <br />No building materials to be stacked on sidewalks and sidewalks to be kept ciean and open for <br />pedestrian travei. <br />Adjust wat�r meter box 1" above sidewalk grade. <br />17. Remove and replace curb, gutter and sidewalk as per Ciry oTE ett S dard Plan #'s 305A & 306 <br />on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />19. <br />Install a Type I concrete driveway per City of Everett Standard #307. <br />Pave driveway from the front property line out to the street paving. <br />20. Contact the _ <br />sewer services. <br />21. <br />22. <br />?3. <br />Water District for connecting provisions for this building's water and <br />A catch basin as per City Standard Pian #W02 with a gas trap per Standard Plan tt410 is required for <br />the parkinc� area. <br />If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, <br />then gravity flow across the public right-of-way. <br />A sprinkler system is required for this building in compliance with the requirements <br />��� <br />